Romania – Construction work for water and sewage pipelines – Aducțiune apă pentru Uzina de apă nr. 1, Uzina de apă nr. 4 și Uzina de apă nr. 5 din Municipiul Oradea, din priza de captare existentă în corpul barajului Oșorhei, jud. Bihor

COMPANIA DE APA ORADEA S.A.RomaniaPublished on Oct 22, 2026
26 days left

Description

For the water supply of the Municipality of Oradea and consumers in the area of operation, in addition to the existing drainage intakes, the realisation of an intake from the Fughiu Reservoir and a water supply to Water Plant No. 5 (and to Water Plant No. 4), as well as a water supply to Water Plant No. 1 is envisaged. Part of the water captured from the lake will be treated at the treatment station related to Water Plant No. 5, and at Water Plant No. 1, the water captured from the lake will be used to supply the enrichment basins related to the existing drains. As part of the present investment, the following works will be carried out:

Object 1. Water supply from the lake intake to the existing desilting basin, which serves Water Plant No. 1

Object 2. Water supply from the lake intake to the intersection with the existing supply pipes that serve Water Plant No. 5

The works provided for in the present documentation are downstream of the Oșorhei Dam, in the areas of strict and restricted sanitary protection, as well as in the bed of the Crișul Repede River. The contractor will organise the works according to its own experience and technology in accordance with the technical offer and the execution schedule (Gantt Chart) within the submitted offer. Bidders have the right to request clarifications regarding the award documentation no later than 15 days before the deadline set for the submission of tenders or requests to participate. The contracting entity will post the consolidated response to the requests for clarification no later than 11 days before the deadline set for the submission of tenders or requests to participate. The contracting entity reserves the right not to respond to any request for clarification after the expiry of the aforementioned term.

SITE VISIT: It is recommended that bidders inspect the project site and surroundings to assess, at their own risk, the expenditure and risk, and the necessary data to prepare the offer. Each interested economic operator will transmit to the contracting entity (to the attention of the Technical Department-GIS-Design), no later than 15 days before the deadline for the submission of tenders, a Letter of Intent regarding the visit to the sites. This will be sent by e-mail to [email protected] and [email protected]. The Letter of Intent will include the names and personal data of the participants in the visit. Representatives of the economic operators authorised to participate in the visit will have with them a written and signed authorisation from the legal representative of the economic operator and an identity card/passport, as applicable. Participants in the site visits will bear all necessary expenses, including transport, for the purpose of carrying out the visit. Failure to comply with this requirement entails the economic operator assuming the consequences arising from the preparation of a defective tender. Throughout the period of execution of the works (including in the event of suspension thereof), the operation of the existing networks will be ensured, as applicable.

CPV codes

Construction work for water and sewage pipelines