Poland – Cycle path construction work – Budowa ścieżek rowerowych oraz miejsc obsługi dla rowerów w ramach zadania: „ROWEROWE ROZTOCZE. DROGI PIESZO-ROWEROWE W OBSZARACH WIEJSKICH”
Description
The subject of the contract is the construction of cycle paths and bicycle service facilities, divided into parts. 1.1. Part 1 The subject of the investment is the expansion of county roads No. 2952L, 3548L, 3549L, 3550L in terms of building a path for pedestrians and cyclists. The subject of the investment is located in the municipality of Susiec, Tomaszów Lubelski County. The contract covers three sections: 1) Section No. 1 in Susiec Municipality, a pedestrian-cyclist path in built-up areas and a cycle path in non-built-up areas in the corridor of county road No. 2952L Czartowe Pole-Oseredek, length 4884.85m and a section in the town of Susiec 1341.79m, total length 6226.64m. 2) Section No. 2 in Susiec Municipality, a pedestrian-cyclist path in built-up areas and a cycle path in non-built-up areas in the corridor of county road No. 3548L Łosiniec-Maziły, length 2664.21m, 3) Section No. 3 in Susiec Municipality, a pedestrian-cyclist path in built-up areas and a cycle path in non-built-up areas in the corridor of county road No. 3549L Nowiny-Majdan Sopocki length 5955.75m 1.2. Part 2 The subject of the investment is the expansion of the county road No. 3544L Bełżec-Chyże in terms of building paths for pedestrians and cyclists. The contract covers a section in Bełżec Municipality, a pedestrian-cyclist path in built-up areas and a cycle path in non-built-up areas in the corridor of county road No. 3544L Bełżec-Chyże length 3668.64m in Tomaszów Lubelski County, and 230.00m in Lubaczów County (non-qualifiable costs), total length 3898.64m. 1.3. Part 3 The subject of the investment is the expansion of county roads No. 3545L and 3543L in terms of building for pedestrians and cyclists. The contract covers two sections: 1) Section No. 1 in Tomaszów Lubelski and Susiec Municipalities, a pedestrian-cyclist path in built-up areas and a cycle path in non-built-up areas in the corridor of county road No. 3545L Rabinówka-Maziły length 5681.26m 2) Section No. 2 in Tomaszów Lubelski Municipality, a pedestrian-cyclist path in built-up areas and a cycle path in non-built-up areas in the corridor of county road No. 3543L length 381.81m In the scope of the investment for parts 1, 2 and 3, the following are included, among others: • construction of a path for pedestrians and cyclists • construction of an unpaved shoulder with gravel • reconstruction of existing standard exits • repair of existing culverts • cutting down trees and shrubs colliding with the investment • securing existing utility networks (in case of their exposure) and removal of collisions • demolition of existing fences 1.4. Part 4 The subject of the contract is the construction of a Bicycle Service Facility (BSF). The location of the facilities is in the town of Bełżec. The subject of the contract includes the following elements: 1) Construction - One shelter ,,A’’, (technical shelter with devices for bicycle repair and charging, and designated for cyclists' rest) - One shelter ,,B’’, (shelter designated for cyclists' rest) 2) Construction of small architecture objects: - four bicycle stands, - one set of bins for selective waste collection, - two lighting poles with monitoring cameras. 3) Installation: of an electrical substation and a cable-measuring junction. 1.5. Part 5 The subject of the contract is the construction of a Bicycle Service Facility (BSF). The location of the facilities is in the town of Rabinówka. The subject of the contract includes the following elements: 1) Construction - One shelter ,,A’’, (technical shelter with devices for bicycle repair and charging, and designated for cyclists' rest) - Two shelters ,,B’’, (shelters designated for cyclists' rest) 2) Construction of small architecture objects: - four bicycle stands, - one set of bins for selective waste collection, - two lighting poles with monitoring cameras. 3) Installation: of an electrical substation and a cable-measuring junction.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – Roboty budowlane pod nazwą: „Zrównoważona termomodernizacja i modernizacja infrastruktury Ginekologiczno-Położniczego Szpitala Klinicznego w Poznaniu na rzecz poprawy efektywności energetycznej i ochrony środowiska” Zwiększenie efektywności energetycznej budynku A. Realizacja prac w trybie zaprojektuj i wybuduj
GINEKOLOGICZNO-POŁOŻNICZY SZPITAL KLINICZNY IM. HELIODORA ŚWIĘCICKIEGO UNIWERSYTETU MEDYCZNEGO IM. KAROLA MARCINKOWSKIEGO W POZNANIUPolandConstruction workSite-development workDistrict-heating mains construction workDeadline in 7 daysPublished on Oct 22, 2026
Poland – Engineering works and construction works – Wykonanie ekranów termoizolacyjnych metodą iniekcji na hałdzie PGG S.A. Oddziału KWK ROW Ruch Rydułtowy.
Polska Grupa Górnicza S.A.PolandEngineering works and construction worksConstruction workDeadline in 11 daysPublished on Oct 22, 2026
Poland – Overhaul and refurbishment work – Remont i termomodernizacja obejmujące projekt „Poprawa efektywności energetycznej w zabytkowym budynku Biblioteki Uniwersyteckiej UMK w Toruniu wraz z instalacją OZE” przy ul. Gagarina 13 w Toruniu.
Uniwersytet Mikołaja Kopernika w ToruniuPolandOverhaul and refurbishment workBuilding installation workElectrical installation workDeadline in 13 daysPublished on Oct 22, 2026
Poland – Wastewater treatment plant construction work – Budowa węzła odbioru ścieków mleczarskich na Oczyszczalni Ścieków Tychy-Urbanowice
Regionalne Centrum Gospodarki Wodno-Ściekowej S.A.PolandWastewater treatment plant construction workPlant engineering design servicesConstruction work for industrial buildingsDeadline in 7 daysPublished on Oct 22, 2026