Poland – Solar photovoltaic modules – Budowa farmy fotowoltaicznej o mocy 2 MW z magazynem energii 2MW/4MWh oraz infrastrukturą towarzyszącą” w lokalizacji Obszaru Plewiska 2” Projekty 10, 11

Przedsiębiorstwo Usług Komunalnych Komorniki Sp. z o.o.PolandPublished on Aug 13, 2026
Deadline passed

Description

The subject investment involves the construction and grid connection of a photovoltaic power plant with a capacity of up to 2 MW (1996.44 kWp) named “Plewiska 10 i 11,” along with the necessary technical infrastructure, and an energy storage system with a rated active system power of 2 MW and a capacity of 4 MWh, along with the necessary technical infrastructure. The photovoltaic power plant with energy storage will be located on plot no. 1220/1, Plewiska, Komorniki, Poznan County. The aim of the investment is to increase the share of energy obtained from Renewable Energy Sources (RES). The installation of RES will help reduce atmospheric emissions of harmful compounds and substances, which will improve the state of the natural environment.

2. Requirements regarding the materials used, delivery and storage conditions, and the assembly of the installation components, as well as other conditions related to the construction process, such as fire protection, occupational health and safety (BHP) requirements, etc., are specified in the project documentation and other annexes to the SWZ.

3. The investment is to be located on part of plot 1220/1, Plewiska 2, Plewiska, Komorniki.

4. The 2 MWp photovoltaic power plant investment includes, in particular: • Development of the executive project for the construction of the photovoltaic farm along with the necessary technical infrastructure; • Change of connection conditions issued by ENEA Operator regarding the types and quantities of devices used, such as photovoltaic panels and inverters; • Agreement of the project documentation with the Distribution Network Operator regarding telemechanics and the metering system for settlement; • Development and agreement with ENEA Operator of the test schedule and traffic cooperation instructions; • Agreement of the documentation with the fire safety expert if required; • Execution of construction and assembly works; • Conducting tests, trials, and acceptance measurements; • Commissioning of the photovoltaic power plant; • Measurement of network parameters for the purpose of reactive power compensation; • Development of as-built documentation. The construction and assembly works of the 2 MWp photovoltaic power plant include: • Execution of the farm connection from the cable junction SN incl. ENEA Operator to the designed transformer station; • Installation, connection, and commissioning of the transformer station; • Installation of the supporting structure for photovoltaic panels by driving it into the ground; • Assembly of photovoltaic panels and inverters on the prepared supporting structure; • Assembly of electrical switchgear with DC side protections; • Assembly of measuring and executive devices for the purpose of reactive power compensation of the SN cable and the unstable states of the photovoltaic farm; • Assembly and commissioning of the CCTV system; • Assembly and commissioning of the SSWiN system; • Assembly and commissioning of the factory software of the photovoltaic installation installed on the Contracting Authority's stationary computer or for reading in the cloud via an internet connection from anywhere in the world with a computer or mobile phone; • Earthing of the installation; • Trenches for medium voltage electrical cables, low voltage, low-current installation cabling, telecommunications cable ducting and earthing; • Execution of the access road to the power plant; • Execution of the photovoltaic farm fence; • Sowing of grass on the photovoltaic power plant site; • Execution of the necessary tests, trials, and measurements.

5. The investment of the Energy Storage with a power of 2 MW and a capacity of 4 MWh includes, in particular: • Development of the Energy Storage concept on plot no. 1220/1, Plewiska, Komorniki, Poznan County; • Obtaining the connection conditions of the Energy Storage to the power grid; • Development of the alternative building project including the Energy Storage along with the accompanying infrastructure: – access roads consistent with the solutions of the photovoltaic power plant documentation, – fencing consistent with the solutions of the photovoltaic power plant documentation, – Transformer station if required, – SN substation of the transformer station if required, – nN substation of the transformer station, – internal power supply line at SN 15kV or nN 800V voltage between the transformer station and the Energy Storage (the choice of connection voltage will be indicated in the concept) consistent with the solutions of the photovoltaic power plant documentation, – internal signal and control lines consistent with the solutions of the photovoltaic power plant documentation, – earthing, – lightning protection installation if required, – SSWiN, CCTV monitoring system consistent with the solutions adopted for the photovoltaic power plant, – BMS, EMS, SCADA systems taking into account the photovoltaic power plant; • Obtaining agreements for the location of the Energy Storage with the network managers adjacent to the Energy Storage; • Agreement of the documentation with the fire safety expert and other authorities required to obtain a building permit and a use permit; • Development of the executive project for the construction of the Energy Storage along with the necessary technical infrastructure; • Agreement of the project documentation compliance with the issued connection conditions of the Energy Storage with the Distribution Network Operator regarding, among others, telemechanics and the metering system for settlement; • Development of the executive project for the construction of the Energy Storage along with the necessary technical infrastructure; • Development and agreement with ENEA Operator of the test schedule, traffic cooperation instructions, and other documents that ENEA Operator will require; The construction and assembly works of the energy storage with a power of 2 MW and a capacity of 4 MWh include: • Execution of the internal power supply line between the Energy Storage and the transformer station of the photovoltaic power plant; • Installation, connection, and commissioning of the Energy Storage; • Installation, connection, and commissioning of the transformer station; • Assembly of devices

CPV codes

Solar photovoltaic modulesSolar installationElectrical installation workElectrical servicesElectrical power systems design servicesConstruction structures and materials; auxiliary products to construction (except electric apparatus)Building installation workConstruction workArchitectural, construction, engineering and inspection servicesRoadworks