Skip to content
Back to search
This tender has expired.

Switzerland – Heating works – Wärmeverteilung und Wärmeabgabesystem

Gemeindeverwaltung HorwSwitzerlandPublished on Aug 23, 2026
Deadline passed

Description

The planned new construction of the Allmend Primary School aims to create a future-proof, sustainable, and pedagogically functional infrastructure for primary school levels 1 to 6. The four-storey building will be constructed using conventional timber construction methods on the school site and will replace the existing outdoor sports facility ("Red Square"). The geological and hydrogeological conditions on the site are considered challenging. In particular, two separate groundwater levels must be taken into account. The building site requires a pile foundation (concrete displacement bored piles), also for service lines and inspection chambers (timber piles). With regard to flood protection, the new building meets the HQ300 requirements. The building services are located on the ground floor and top floor (no basement) to avoid damage from flood events. The building's load-bearing structure is based on a solid timber frame made of Fi/Ta. This is supplemented by three massive service cores made of reinforced concrete. The spiral staircases between the service cores are also made of reinforced concrete. The facade consists of prefabricated timber frame external elements. The building will be certified according to SNBS 2.1 Construction (the target is Gold Certification). The energy supply is provided via a connection to the local district heating network SeeEnergy (winter heat, summer cooling water). All areas will be equipped with underfloor heating. All floor coverings are made of polished industrial concrete and serve as thermal storage and light free cooling in relation to summer overheating hours. The control is carried out via room thermostats according to the specified setpoint. For power generation, a building-integrated photovoltaic system will be installed on the roof, which serves as the roof covering. Brise-Soleil constructions made of metal along the east and west facades serve as sunshades and form the structural weather protection of the facade. In the field of building services, a mechanical ventilation system is only planned for the areas of the internal cores and the auditorium. The classrooms receive fresh air via manual natural window ventilation. The building is fully accessible. The planned school building with a total height of approximately 19 m in hybrid construction is considered a building of medium height. The fire protection planning is carried out according to quality level QSS 2 of the BS guideline of the VKF. The surrounding design is based on the design concept "Centre 1st + 2nd Stage" and contributes to the development of a uniform public space in the centre of Horw. The school playground is designed as a traffic-free, publicly accessible space, taking into account its use outside of school hours. The school garden is exclusively for school use and is designed to be child-friendly and close to nature. In the sense of climate adaptation and biodiversity promotion.

CPV codes

Heating works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders