Poland – Solar energy – Instalacje PV/magazyny energii na budynki stanowiące własność gminy Dobromierz w ramach projektu pn. Programy Partnerskie Energetyki Komunalnej OZE dla gmin powiatu świdnickiego (PPEK)

Gmina DobromierzPolandPublished on Nov 19, 2026
31 days left

Description

Subject of the contract: The subject of the contract is the design, supply and installation of hybrid photovoltaic micro-installations with energy storage systems, a backup (emergency) power supply system and an integrated management system to integrate these production systems with the Polish energy market, intended for operation in municipal public utility facilities: 1) Orlik in Roztoka, ul. Sportowa 2, PV system power min. 15.8 kWp, energy storage with a usable capacity of min. 23 kWh 2) OSP Roztoka, ul. 3 Maja 53, PV system power min. 10.01 kWp, energy storage with a usable capacity of min. 16 kWh 3) Primary School in Dobromierz, ul. Podgórna 2, PV system power min. 13.4 kWp, energy storage with a usable capacity of min. 23 kWh 4) Primary School in Gniewków, Gniewków 3, energy storage with a usable capacity of min. 84 kWh 5) Primary School in Roztoka, ul. Jana Pawła II 9, energy storage with a usable capacity of min. 84 kWh 6) Village Community Centre in Czernica, Czernica 8, PV system power min. 13.4 kWp, energy storage with a usable capacity of min. 23 kWh 7) Village Community Centre in Kłaczyna, Kłaczyna 94A, PV system power min. 13.4 kWp, energy storage with a usable capacity of min. 27 kWh 8) Village Community Centre in Roztoka, ul. 3 Maja 61, PV system power min. 13.4 kWp, energy storage with a usable capacity of min. 23 kWh 9) Municipal Services Base, ul. Spacerowa 3, Dobromierz, PV system power min. 39.20 kWp, energy storage with a usable capacity of min. 84 kWh

The contract includes in particular:

- preparation of the technical documentation required by law and meeting the requirements specified in these requirements,

- obtaining all the necessary legal agreements, opinions and notifications, especially in the field of fire safety and structural safety,

- supply of equipment and materials,

- installation, commissioning, configuration and handover of the installation for use,

- preparation of acceptance documentation containing in particular technical sheets, technical approvals, equipment and material certificates used in the construction of the installation, acceptance and measurement protocols and as-built drawings,

- preparation of operating instructions and user training for the installation.

The contracting authority requires that:

- the nominal power of the installed photovoltaic systems is not less than the power required for each location,

- the capacity of the energy storage systems is not less than the required capacity for each location.

Since the installation and construction works will be carried out in public buildings, including educational ones, which are fully used, all works must be carried out in agreement with the users, while maintaining the least disruptive conditions for the users. The work areas must be absolutely secured against access by children and adult users. In all buildings, after damaging the surfaces of ceilings and walls, repair and painting works (finishing and painting the wall surfaces where grooving was carried out - painting in white) must be carried out. Repair and finishing works must be carried out carefully and aesthetically. The detailed scope and manner of executing the contract is specified in Annex No. 1 to SWZ "Technical Requirements for Hybrid Systems" and the documentation contained in the file "Location Descriptions". The contracting authority provides for 9 partial payments, corresponding to the 9 locations covered by the subject of the contract. The remuneration for each location will be payable after completion of all the works provided for that location and its acceptance by the contracting authority. The subject of the contract must be implemented in accordance with the principle of "do no significant harm" (DNSH), referred to in Article 17 of Regulation (EU) 2020/852 of the European Parliament and of the Council of 18 June 2020 establishing a framework to facilitate sustainable investment.

CPV codes

Solar energyInstallation services of electricity distribution and control equipment