Switzerland – Industrial machinery – LOS 1 Hydraulische Steuerung und Verteilleitung Hilfssysteme Kraftwerk Pradella
Description
The Engadiner Kraftwerke AG is renewing the hydraulic water and oil control systems of the four Francis turbines at the Pradella power plant, which have been in operation since the early 1970s. The subject of the contract includes, in particular, the planning, design, manufacture, delivery, installation, testing and commissioning of the new hydraulic units, pipelines and associated components for controlling the ball valves, guide vane servomotors and pressure regulators. The contract also includes the renewal of the pressure shaft drainage and pressure shaft residual drainage, the control line and the inspection slide valve for the irrigation of Sent. The scope of services also includes all necessary dismantling, dismantling and disposal work on the existing plant components as well as the necessary documentation, coordination and evidence services. The renewal aims to ensure the long-term operational safety, availability and economic efficiency of the power plant.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Vehicle location system – MP 2026.03.839 - Acquisition d'une solution de géolocalisation indoor/outdoor
Transports publics de la région lausannoise saSwitzerlandVehicle location systemCommand and control system, printing, graphics, office automation and information-processing equipmentDeadline in 57 daysPublished on Nov 17, 2026
Switzerland – Dosing plant – ARA Thurau, Phosphatfällung
Abwasserverband ThurauSwitzerlandDosing plantSewage plant equipmentDeadline in 71 daysPublished on Nov 16, 2026
Switzerland – Machinery for the treatment of sewage – ARA Thurau, Ausrüstung Sand- und Fettfang
Abwasserverband ThurauSwitzerlandMachinery for the treatment of sewageSewage plant equipmentDeadline in 71 daysPublished on Nov 16, 2026
Switzerland – Sludge-processing equipment – ARA Thurau, Muldenverladestation inkl. Mulden und Führungsschienen
Abwasserverband ThurauSwitzerlandSludge-processing equipmentConveyorsParts of lifting and handling equipmentDeadline in 71 daysPublished on Nov 16, 2026