Poland – Multi-dwelling buildings construction work – Budowa budynku mieszkalnego wielorodzinnego wraz z infrastrukturą zewnętrzną i zagospodarowaniem terenu przy ul. Strzeleckiej w Środzie Wielkopolskiej
Description
The subject of the contract is the construction and equipping of an investment project named: “Construction of a multi-family residential building with external infrastructure and land development at ul. Strzeleckiej in Środa Wielkopolska” on plot no. 51/2, which specifically includes the execution of full-scale construction works covered by the design and execution documentation, as well as detailed drawings and details for the Investment, for which the Contracting Authority has obtained the final building permit, which includes, in particular, the following works and services: 1) construction of a multi-family residential building with accompanying infrastructure, internal roads, parking, access and exit to the public road, installations and networks, 2) land development with planting and maintenance during the warranty period, 3) construction and possible reconstruction of networks and connections on the Investment Site, and to the necessary extent exceeding the Investment Site in accordance with the Project Documentation, 4) obtaining the final decision on the permit for use of the building and the investment site covered by the contract. The condition for starting construction works is the performance of soil tests detailing the results of the tests included in the technical documentation. In case of lack of compliance with the results, the Contractor, in cooperation with the Contracting Authority and the Designer, will propose a solution in accordance with the technical requirements and building knowledge. In the event of a change in soil conditions during the construction works resulting from the fault of the Contractor (e.g. failure to secure the excavation, removal of soil below the design levels, etc.), the Contractor will cover the costs of additional works. 2. A detailed description of the subject of the contract and the method of contract execution is specified by: a) building permit together with the project documentation and technical specification of the execution and acceptance of construction works - Annex no. 4 to SWZ b) draft contractual provisions - Annex no. 5 to SWZ c) the finishing standard specified by the Contracting Authority, which is an annex to the Contract (Annex no. 5 – Draft contractual provisions) 3. As part of the subject of the contract, the Contractor will carry out the contracted construction works, prepare the post-construction documentation and the operating instructions for the facility, including the instructions for the use of apartments and the instructions for the operation of equipment and installations, as well as carry out the commissioning of equipment and installations and the training of the Contracting Authority's personnel to the extent necessary for their operation.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Realizacja zadania pn.: „Rewitalizacja Parku Lisiniec w Częstochowie – III etap – Budowa strefy rekreacji Pacyfik w Parku Lisiniec”, polegającego na zaprojektowaniu i wykonaniu robót dla zadania prowadzonego w systemie „zaprojektuj i buduj”.
Gmina Miasto CzęstochowaPolandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsBuilding demolition and wrecking work and earthmoving workExcavating and earthmoving workDeadline in 25 daysPublished on Nov 19, 2026
Poland – Construction work for waterways – Tor wodny na rzece Elbląg na odcinku od punktu P1 do punktu Port
Dyrektor Urzędu Morskiego w GdyniPolandConstruction work for waterwaysRiverbank protection worksRiver regulation and flood control worksDeadline in 5 daysPublished on Nov 19, 2026
Poland – Construction work for gas pipelines – Przebudowa gazociągu DN400 MOP 4,22MPa Sędziszów – Tarnów Mościce wraz z odgałęzieniami do stacji gazowych
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.PolandConstruction work for gas pipelinesDeadline in 45 daysPublished on Nov 19, 2026
Poland – Construction work – Odbudowa infrastruktury wodno-kanalizacyjnej uszkodzonej przez powódź na obszarze Gminy Kłodzko.
"Wodociagi Gminy Kłodzko" sp. z o.o.PolandConstruction workEngineering design servicesWater-treatment plant construction workDeadline in 17 daysPublished on Nov 19, 2026