France – Hydraulic turbines – 73 BRIDES LES BAINS - Groupe turbogénérateur
Description
Installation of a new turbo-generator set and associated adaptation works, including: • Supply: o A Pelton turbine set: Gross head: 101 m Net head at Pmax: 92.6 m Nominal flow rate: 1 m3/s Indicative nominal power: 820 kW[MQ1.1] o A synchronous alternator: Rotation speed: 600 rpm Apparent power 870 kVA – 400 V o A hydraulic power unit (HPU) • Services: o General studies; o Design and sizing studies of equipment; o GC adaptation studies; o Site installations; o Dismantling of the existing set; o Mechanical assembly of the new set, the hydraulic power unit, the various ventilation and piping elements; o Embedding of the new set in the existing civil engineering; o Training of EDF personnel; Excluded from the Contractor's Scope: • The demolition works of the existing civil engineering • The electrical works and control-command works related to the commissioning of the set This list is not exhaustive. The total scope will be described in a technical specification, which will be attached to the tender dossier.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Heat pumps – Fourniture, travaux d’installation, mise en service et maintenance d’une pompe à chaleur pour le Centre Inria de l’université de Bordeaux
Centre Inria de l'université de BordeauxFranceHeat pumpsHeating, ventilation and air-conditioning installation workRepair and maintenance services of central heatingDeadline in 10 daysPublished on Oct 19, 2026
France – Lifting and handling equipment – Moyens de manutention motorisés
Union des Groupements d'Achats PublicsFranceLifting and handling equipmentLifting trucksLifting, handling, loading or unloading machineryDeadline in 56 daysPublished on Oct 19, 2026
France – Lifting trucks – Conception, fabrication et livraison d’un chariot cavalier réduit (échelle 1/5ème) robotisé et instrumenté pour le laboratoire CRIStAL dans le cadre du CPER RITMEA
Université de LilleFranceLifting trucksDeadline in 17 daysPublished on Oct 19, 2026
France – Parts of escalators – Fourniture des pièces détachées diverses pour la maintenance des escaliers mécaniques de la RATP
RATPFranceParts of escalatorsNo deadline givenPublished on Oct 19, 2026