Skip to content
Back to search

France – Hydraulic turbines – 73 BRIDES LES BAINS - Groupe turbogénérateur

HYDROSTADIUM SAFrancePublished on Jun 11, 2026
No deadline given

Description

Installation of a new turbo-generator set and associated adaptation works, including: • Supply: o A Pelton turbine set:  Gross head: 101 m  Net head at Pmax: 92.6 m  Nominal flow rate: 1 m3/s  Indicative nominal power: 820 kW[MQ1.1] o A synchronous alternator:  Rotation speed: 600 rpm  Apparent power 870 kVA – 400 V o A hydraulic power unit (HPU) • Services: o General studies; o Design and sizing studies of equipment; o GC adaptation studies; o Site installations; o Dismantling of the existing set; o Mechanical assembly of the new set, the hydraulic power unit, the various ventilation and piping elements; o Embedding of the new set in the existing civil engineering; o Training of EDF personnel; Excluded from the Contractor's Scope: • The demolition works of the existing civil engineering • The electrical works and control-command works related to the commissioning of the set This list is not exhaustive. The total scope will be described in a technical specification, which will be attached to the tender dossier.

CPV codes

Hydraulic turbinesAlternatorsHydraulic power packsFloodgatesInstallation services of turbines

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders