Bulgaria – Construction work – „Възстановяване на настилки тила на 16 к.м. и площадка за хладилни контейнери в тила на 17 к.м., пристанищен терминал Варна-запад“,
Description
The subject of the present public procurement is the selection of a contractor for the object "Restoration of the tarmac of 16 km and a platform for refrigerated containers in the rear of 17 km, Varna-West port terminal". The envisaged construction works consist of the following activities: Geodetic survey and vertical planning; loading and removal of construction waste to a landfill; dismantling, loading and removal of up to 3000 m of reinforced concrete panels with approximate dimensions 190/370/20 cm; breaking of reinforced concrete elements with an excavator with a hydraulic hammer, loading and removal to a landfill; removal of crushed stone pavement, incl. loading, transportation and unloading to a landfill; milling of asphalt concrete pavement, incl. loading, transportation and unloading to a landfill incl. landfill fee; mechanical excavation of soil masses; laying and compaction of crushed stone fractions; laying of polyethylene; making and removing formwork for the field; laying of reinforcement No. 10 through 20 cm; double layer; laying of XPS 2 cm for joints; installation of metal dowels f32-50 cm 3 pcs/m; installation of corrugated pipe f32-50 cm 3 pcs/m; making a concrete pavement with concrete C30/37 with a thickness of 20 cm; processing of concrete surface with topping and rotary brushes and brushes; making of expansion joints; making of dummy joints; making of new rectangular shafts 2.0/2.0/1.7 with wall and bottom thicknesses 20 cm. and reinforced concrete cover 20 cm - /concrete C30/37, steel class B500/; laboratory tests; excavation for drainage; delivery and laying of high-strength flexible, corrugated, perforated PVC pipe F200; laying of geotextile; laying of drainage material; delivery of new equipped prestressed concrete sleepers with L=2.60m (ST6/V91), or equivalent; new wooden switch sleepers from broad-leaved material; delivery of new railway switch CO-S49-1:9-190, set with fastening material; new rails S49; new insulated joints with 6 holes /set with bolts, washers and nuts/; delivery and laying of new ballast; laying of new railway track; installation of railway switch CO-S49-1:9-190 outside the track and in the track; levelling of railway track and switches with electric tamping /ET/; tamping with mobile railway composition; making of pavement with granite setts, including all related costs; loading and removal of unusable reinforced concrete sleepers to a landfill, incl. landfill fee; collection and removal of construction waste.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Bulgaria – Construction work – Основен ремонт на улица "Патриарх Евтимий Търновски" в ПИ 20242.35.390, ПИ 20242.500.9021, ПИ 20242.500.9076 и ПИ 20242.84.451 по КККР на гр. Дебелец, общ. В. Търново, вкл. подмяна на водопровод по същата
ОБЩИНА ВЕЛИКО ТЪРНОВОBulgariaConstruction workExcavating workEarthmoving workDeadline in 33 daysPublished on Oct 13, 2026
Bulgaria – Burglar-alarm system installation work – „Демонтаж, преместване и монтаж на системи за видеонаблюдение от стар източен вълнолом по фасадите на сгради в Зона за обществен достъп – ПТ „Бургас-Изток 1“
ПРИСТАНИЩНА ИНФРАСТРУКТУРА ДПBulgariaBurglar-alarm system installation workDeadline in 28 daysPublished on Oct 13, 2026
Bulgaria – Road construction works – „Основен ремонт и рехабилитация на общински път GAB 3307 в община Трявна“.
ОБЩИНА ТРЯВНАBulgariaRoad construction worksDeadline in 30 daysPublished on Oct 13, 2026
Bulgaria – Road construction works – Изграждане на улица с о.т. 767-950-951-952-953-954-955-956-957-958 /като продължение на ул. „Цар Асен Велики“/ и улица IV клас /като продължение на улица с о.т. 957-958/ с пътно кръстовище за връзка с общински път BGS 1220 /II-99, Созопол – Приморско/ – в.с. Дюни – /II-99/ Созопол
ОБЩИНА СОЗОПОЛBulgariaRoad construction worksWorks related to water-distribution pipelinesDeadline in 36 daysPublished on Oct 12, 2026