Romania – Building construction work – Servicii de proiectare, asistență tehnică, verificare tehnică și execuție lucrări pentru obiectivul de investiții „Reabilitare integrată clădire Liceu Teoretic Marin Preda, din municipiul Turnu Măgurele, județul Teleorman” obiectiv de investitii ce se încadrează în Programului național de consolidare a clădirilor cu risc seismic ridicat (PNCCRS) coordonat de MDLPA,
Description
Design, technical assistance, technical verification and construction services for the investment objective “Integrated Rehabilitation of the Marin Preda Theoretical High School Building, Turnu Măgurele, Teleorman County”, selected for its financing under the National Programme for the Consolidation of Buildings at High Seismic Risk (PNCCRS) coordinated by MDLPA, subprogramme for the design and execution of intervention works for buildings of public interest and utility. The main objective of this investment is to carry out intervention works on the Marin Preda Theoretical High School Building, which has insufficient seismic protection levels, degradation or damage due to seismic actions, as well as to ensure the functionality of these and reduce the specific annual energy consumption. The total estimated value is 23,013,793.59 lei excluding VAT, broken down by budget lines, as follows:
Cap. 3 Design and Technical Assistance Costs
3.5 Design
3.5.5 Technical and execution detail project verification and quality control 40,000.00 lei
3.5.6 Technical design and execution details 270,000.00 lei
3.8 Technical Assistance
3.8.1 Technical assistance from the designer 116,157.83 lei
Cap. 4 Base Investment Costs
4.1 Construction and Installations
4.1.1 Intervention works 10,764,951.96 lei
4.1.2 Works for increasing energy efficiency 9,247,511.20 lei
4.1.4 Costs related to intervention works for improving the foundation site 1,680,467.20 lei
TOTAL subchapter 4.1 21,692,930.36 lei
4.2 Installation of machinery, technological and functional equipment 194,190.08 lei
TOTAL subchapter 4.2 194,190.08 lei
4.3 Machinery, technological and functional equipment requiring installation 454,754.69 lei
TOTAL subchapter 4.3 454,754.69 lei
TOTAL Cap. 4 22,341,875.13 lei
5.1 Site Organisation - 245,760.63 lei
TOTAL works execution (Cap. 4 + Cap. 5) 22,587,635.76 lei
TOTAL (design and execution) 23,013,793.59 lei
The contracting authority has provided in the budget of the objective expenses “diverse and unforeseen”, “expenses related to the budget margin” and “expenses for the establishment of the implementation reserve for price adjustment”. These are not included in the estimated value subject to the offer, but have been taken into account in determining the award procedure. Interested economic operators have the right to request clarifications or additional information regarding the award documentation. The number of days until which clarifications can be requested before the deadline for submission of tenders: 14. The Contracting Authority will respond clearly and completely to all requests for clarification/additional information 7 days before the deadline set for the submission of tenders.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Romania – Electrical installation work – Proiectare (PT+DDE) și execuție instalații de utilizare și racordare la rețeaua de distribuție a energiei electrice a obiectivului de investiții „Construire secții la Spitalul nr. 2 Vaslui”
JUDETUL VASLUIRomaniaElectrical installation workSubstation construction workElectrical fitting workDeadline in 30 daysPublished on Aug 16, 2026
Romania – Construction work for water and sewage pipelines – Proiectul regional de dezvoltare a infrastructurii de apă și apă uzată în județul Mureș, Lot 1 -3
COMPANIA AQUASERV S.ARomaniaConstruction work for water and sewage pipelinesScada or equivalent systemSite-development workDeadline in 51 daysPublished on Aug 16, 2026
Romania – Road construction works – PROIECTARE SI EXECUȚIE LUCRĂRI: „Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot IV
Municipiul Cluj-NapocaRomaniaRoad construction worksRoad bridge construction workEngineering-design services for traffic installationsDeadline in 24 daysPublished on Aug 16, 2026
Romania – Road construction works – PROIECTARE SI EXECUȚIE LUCRĂRI: Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot V
Municipiul Cluj-NapocaRomaniaRoad construction worksRoad bridge construction workEngineering-design services for traffic installationsDeadline in 23 daysPublished on Aug 16, 2026