Czechia – Solar photovoltaic modules – Instalace nových fotovoltaických elektráren v areálech společnosti ČEPRO, a.s.
Description
The subject of the public procurement is the construction, installation, commissioning and full operation of photovoltaic power plants (PVPP) in the storage areas of the contracting authority, including the complete provision of UPOS and UTP, the preparation of documentation for the execution of the work and the documentation of the actual execution of the work and the provision of cooperation with the contracting authority to obtain a subsidy and for negotiations with ERÚ. The public procurement is divided into 4 parts: Part 1 – PVPP Nové Město (499.5 kWp), Part 2 – PVPP Šlapanov (994.5 kWp), Part 3 – PVPP Potěhy (499.5 kWp), Part 4 – PVPP Cerekvice (499.5 kWp). The contracting authority requires the supply of SolarEdge technology or another technically equivalent solution allowing full integration into the existing SolarEdge monitoring system. Detailed specifications are given in the tender documentation.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Solar installation – Instalace FVE na objektech a pozemku Města Bíliny
Město BílinaCzechiaSolar installationEngineering design servicesEngineering design services for the construction of civil engineering worksDeadline in 31 daysPublished on Oct 28, 2026
Czechia – Solar energy – Fotovoltaika v obecních objektech Okrouhlice - design and build
Obec OkrouhliceCzechiaSolar energyDeadline in 6 daysPublished on Oct 28, 2026
Czechia – Solar installation – Instalace FVE na objektech a pozemku Města Bíliny
Město BílinaCzechiaSolar installationEngineering design servicesEngineering design services for the construction of civil engineering worksDeadline in 31 daysPublished on Oct 28, 2026
Czechia – Solar panels – Dodávka a instalace fotovoltaiky Aquapark Děčín, Oblouková 1400/6, Děčín I
Statutární město DěčínCzechiaSolar panelsSolar photovoltaic modulesSolar installationDeadline in 24 daysPublished on Oct 27, 2026