Poland – Construction work – Modernizacja części dydaktycznej budynku A2 i CD w zakresie sal wykładowych w formule zaprojektuj i wybuduj w ramach zadania nr 2 projektu Strefa Nauki i Wymiany Wiedzy

Uniwersytet Medyczny w ŁodziPolandPublished on Jul 28, 2026
19 days left

Description

The subject of the contract is a construction project involving the modernisation of the teaching part of building A2 and CD in the scope of lecture halls in the design and build formula – project Science and Knowledge Exchange Zone. The works will be carried out as part of task no. 2 of the project “Science and Knowledge Exchange Zone” (investment financed from the state budget). The Detailed Description of the Subject of the Contract is Annex no. 2 to SWZ – Functional User Program along with annexes. The Contracting Authority informs that in the event of the use in SWZ of the description of the subject of the contract by indicating trade names, trademarks, patents or origin, source or special process or norm, European technical approvals, approvals, technical specifications and technical reference systems, it aims to specify the subject of the contract. The Contracting Authority allows the submission of equivalent offers to those described by indicating trade names, trademarks, patents or origin, provided that the proposed solutions have, at least, the same functional features/parameters as indicated in the SWZ, and their quality is not worse than the quality specified in the product specification. In the event of the use in the description of the subject of the contract of norms, European technical approvals, approvals, technical specifications and technical reference systems, the Contracting Authority allows equivalent solutions. With regard to all trade names, patents or certificates of origin, source or special process as well as norms, European technical approvals, approvals, technical specifications and technical reference systems indicated by the Contracting Authority in the tender documentation, the words “or equivalent” are added. The Contractor is obliged to prove that the solutions offered by him are equivalent to those described by the Contracting Authority. The Contractor is obliged to implement the contract on the principles and conditions described in the model contract constituting Annex no. 4 to SWZ. Implementation period: Implementation period of the contract: 91 days from the date of signing the contract, no later than by 30.11.2026. Additional information: The Contracting Authority has applied a reduction in the tender submission period by 5 days in accordance with art 138 para 4 of the PZP Act and in connection with the fact that the submission of tenders takes place entirely using electronic communication means, as specified in art 63 para 1. The Contracting Authority envisages the possibility of awarding contracts, as referred to in art. 214 para. 1 point 7 of the PZP, not exceeding 3,405,585.00 PLN net, involving the repetition of similar repair and construction works, specified in the contract documentation, in particular the modernisation, reconstruction, extension of buildings CD, A2, CKD for the educational activities of the Medical University of Łódź together with the necessary technical and installation infrastructure. Approximate scope of works: Execution of installation construction works including: a)Demolition of floors and floor coverings including the demolition of the substructure under the floor covering along with existing insulation if any. b)Demolition of floor coverings including stairwell coverings, thresholds, entrances and exits from the building. c)Demolition of partition walls d)Removal of internal plaster from walls and ceilings, and demolition of all wall and ceiling coverings e)Demolition of all recesses in walls f)Demolition of all existing installations along with fittings, receivers etc. g)Execution of floor h)Execution of floors with acoustic insulation meeting the requirements of acoustic insulation and damping along with reinforcements in the scope of mounting laboratory equipment and furniture i)Execution of gypsum machine plaster walls as well as thin-layer plaster j)Execution of partition walls in GK technology along with acoustic insulation and system reinforcements enabling the mounting of all furniture and equipment. k)Execution of mobile partitions l)Masonry works in the necessary scope. m)Execution of fire protection in the scope of the main load-bearing structure of the building to the required REI class n)Execution of floor coverings with heterogeneous PVC coverings, heterogeneous PVC in conductive tiles, PVC GTI coverings (in the scope of corridors and communication routes), epoxy resin floors in the scope of the technical superstructure, ceramic tile coverings in the scope of the stairwell, sanitary-hygienic premises. o)Execution of wall coverings PVC, wall coverings in the scope of communication routes, and wall tiles in the scope of sanitary-hygienic premises. p)Supply and installation of lighting fixtures q)Supply and installation of central ventilation units and ventilation systems r)Execution of painting works s)Installation of internal parapets t)Demolition works u)Execution of suspended and fixed ceilings g/k in the form of accents (false ceilings) in communication routes including the stairwell and punctually in rooms v)Installation of internal aluminium glazed joinery w)Installation of external window and door joinery x)Installation of HPL system partitions y)Execution of carpentry works including the installation of new changing room lockers and porter's booths z)Execution of a new floor with ceramic tiles aa)Execution of a light steel structure with walls made of layered panels with a PUR core taking into account the substructure for the needs of mounting photovoltaic panels according to the industry project, (new premises for installation devices), bb)Execution of complete electrical, low-voltage, audiovisual, sanitary including water and sewerage, gas, central heating, technological heat, cold, mechanical domestic ventilation and technological mechanical ventilation including fume hoods, laminar flow cabinets etc., and station drains, gas detection installations etc. cc)Other necessary general construction works enabling the implementation of the subject of the contract. dd)Supply and installation of equipment (...) point 3.14 SWZ.

CPV codes

Construction workOther building completion workEngineering design servicesHeating, ventilation and air-conditioning installation workInstallation of telecommunications equipment

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders