Germany – Engineering services – Gemeinde Morbach - Umbau und Erweiterung der Kita Gonzerath, Los 2 - Planungsleistungen der Technischen Ausrüstung HLS und Elektro
Description
The municipality of Morbach intends to carry out comprehensive renovation and expansion of a part of the Gonzerath day-care centre. The starting point of the measure is a water pipe damage in the extension building of the day-care centre, which was detected in 2024. During the repair of the damage, it was found that, due to the contamination of the insulation located in the floor structure, a complete demolition of the affected part of the building is necessary. During the demolition work, another significant construction defect was discovered, which was not due to the water damage. Therefore, a mere restoration of the existing building stock is neither technically nor economically sensible. At the same time, due to the requirements of the Kindertagesstättengesetz Rheinland-Pfalz (KiTa-Zukunftsgesetz), there is an additional need for spatial adaptation and expansion. The existing areas no longer fully meet the current functional requirements for operating a three-group day-care centre. In particular, additional areas are required for a kitchen with catering for up to 60 children, food and domestic economy rooms, a bistro or multifunctional area, further rest and ancillary rooms, storage areas and additional traffic areas. To create the necessary expansion areas, the municipality has acquired an immediately adjacent plot of land. Thus, there are now the planning and actual conditions to further develop the day-care centre location in the long term and to cover the future space requirements. The subject of the measure is therefore not only the renovation of the existing water damage, but the holistic structural and functional reorganisation of the location. The renovation of part of the existing building, including the elimination of the existing damages, as well as the construction of an extension building on the newly acquired areas, is planned. In addition, the outdoor facilities must be adapted to the new building structure and functionally and aesthetically reordered. The aim is to create a modern, economical and sustainable day-care centre that meets the requirements of the KiTa-Zukunftsgesetz and enables long-term future-proof operation. It must be taken into account that the construction and renovation work must be carried out during the ongoing operation of the day-care centre in the existing building.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Architectural services for buildings – Erweiterung Ganztagesgrundschule in Appenweier/Urloffen - Objektplanung
Gemeinde AppenweierGermanyArchitectural services for buildingsNo deadline givenPublished on Oct 20, 2026
Germany – Engineering services – Neubau 2-gruppige KiTa mit Vereinsräumen IG Waid, Weinheim - HLS-Planung
Stadt WeinheimGermanyEngineering servicesNo deadline givenPublished on Oct 20, 2026
Germany – Architectural, construction, engineering and inspection services – Quartiersversorgung 2
EGC Entwicklungsgesellschaft Cottbus mbHGermanyArchitectural, construction, engineering and inspection servicesNo deadline givenPublished on Oct 20, 2026
Germany – Engineering design services for mechanical and electrical installations for buildings – Königsgarten Sanierung /Neubau Wohnhaus mit Nebengebäuden und Sanierung Scheune mit Technikzentrale
Gemeinde SchönewördeGermanyEngineering design services for mechanical and electrical installations for buildingsDeadline in 29 daysPublished on Oct 20, 2026