Romania – Solar installation – Furnizare, montare, instalare, testare și punere în funcțiune a sistemului fotovoltaic aferent obiectivului „IMPLEMENTAREA UNEI NOI CAPACITĂȚI DE PRODUCȚIE DE ENERGIE ELECTRICĂ DIN SURSE REGENERABILE CEF 300KW-LOCALITATEA VALEA IAȘULUI, JUDEȚUL ARGEȘ’’

COMUNA VALEA IASULUI (PRIMARIA COMUNEI VALEA IASULUI)RomaniaPublished on Sep 20, 2026
32 days left

Description

The photovoltaic system will consist of a total of 480 photovoltaic panels, each with a nominal power of 625W (watt). The panels will be placed on a metal structure anchored to the ground, oriented to maximize solar radiation capture throughout the day. The chosen configuration ensures a high efficiency of conversion of solar energy into electrical energy and increased durability over time, with the panels designed to withstand various climatic conditions. The total installed power at the level of the photovoltaic field (panel level) will be 300.0 kWp (kilowatt-peak), which reflects the maximum capacity for generating electrical energy under standard test conditions (STC). For the conversion of the energy produced in direct current by the panels into alternating current usable in the grid or for self-consumption, the system will be equipped with three (three) high-efficiency inverters, with a power of 100 kW. Therefore, the total installed power at the level of the inverter system will be 300.0 kW, which ensures an adequate capacity for taking over and converting the energy generated by the photovoltaic field, with a technical reserve that allows operation under peak conditions and optimization of the overall performance of the plant. The system has been designed to allow easy integration into the local electrical grid and to support the self-consumption needs of the community infrastructure. The choice of technical components was made based on an energy and economic feasibility analysis, taking into account the climatic specifics of the area, solar radiation conditions, and the objective of maximum efficiency in operation. This technical configuration will allow not only the constant production of green energy but also efficient control of the energy flow, through the use of intelligent inverters, which monitor the essential parameters of the system and contribute to safe, durable, and economical operation of the photovoltaic power plant. The evacuation of the electrical energy produced by the photovoltaic plant will be carried out through a connection point to the electrical grid established at the 20kV voltage level, in the 20kV line cell provided for in PC 20kV CEF Valea Iasului. This technical solution has been approved by ATR no. 001500044662/29.04.2025. The works for the realization of the installation of the connection from the technical connection notice will be carried out within the framework of another project. The requirements of the PT will be respected.

CPV codes

Solar installationSolar photovoltaic modulesElectrical installation workLow-voltage installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders