Skip to content
Back to search

Germany – Architectural, construction, engineering and inspection services – Machbarkeitsstudie Generalsanierung

Staatl. Bauamt München 1GermanyPublished on Oct 04, 2026
No deadline given

Description

Creation of an interdisciplinary feasibility study for the general renovation of the Bavarian State Opera National Theatre

The National Theatre is the venue for the Bavarian State Opera, the Bavarian State Orchestra and the Bavarian State Ballet. In its current neoclassical appearance, the opera house was first opened in 1818. Five years later, the building was completely destroyed by a fire and rebuilt. The second reconstruction, following the destruction during World War II, except for the outer walls, took place between 1958 and 1963. Since the reopening in 1963, no general renovation has been carried out. The building complex also includes the decoration warehouse along Alfons-Goppel-Straße and the so-called "New Rehearsal Building" completed in 2003 at Marstallplatz. Other buildings used for rehearsal and performance operations are the buildings of the Bavarian State Ballet, Platzl 6 and 7, which are former corps buildings erected in the Renaissance style in 1899. With a time lead and in parallel to the feasibility study, a comprehensive needs concept including vision development ("Opera of the Future") will be commissioned by the user. At the same time, the needs planning for an interim solution during the general renovation of the National Theatre will be created. The feasibility study should be continuously coordinated with the user and the needs planning in an iterative process. The contributions and results from the feasibility study should then be integrated into the needs planning and vice versa. The study should deal with the structural and technical renovation requirements, functional optimizations of operational processes, possible expansion options, the essential concerns of monument preservation, and, not least, the possibilities of energetic optimization of the building services. In the creation of the feasibility study, the goals of sustainable building should be pursued in particular. A holistic approach is to be provided to consider the entire life cycle of the buildings, taking into account the ecological, economic and socio-cultural quality as well as the technical and procedural aspects. The subject of the contract includes the creation of a feasibility study for the above-mentioned uses in three variants as a basis for decision-making for the general renovation planned for the future. Further information can be found in the task description and the tender documents.

CPV codes

Architectural, construction, engineering and inspection services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders