Skip to content
Back to search

Switzerland – Boiler installations – EBP-671 Ersatz Endüberhitzer 3 für HHKW

Energie Wasser BernSwitzerlandPublished on Aug 25, 2026
41 days left

Description

With the present procurement of the wood-fired power plant (HHKW) in the Energiezentrale Forsthaus (EZF), Energie Wasser Bern intends to replace the existing superheater tubes of superheater 3 and 2b. The superheater tubes will reach their technical maximum lifespan in the next approximately 2 years and must therefore be replaced. Superheaters 3 and 2b consist of 2 packages with 31 tubes each, with a total weight of approximately 7000 kg of boiler tubes with a diameter of 38 mm.

CPV codes

Boiler installationsDistrict heating
AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders