Poland – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Budowa infrastruktury rowerowej w ciągu ulic: Krasińskiego, Markwarta, Sieńki, Moniuszki, Skłodowskiej-Curie i Łęczyckiej w Bydgoszczy
Description
The subject of the contract are construction works in the meaning of art. 7 point 21 of the Pzp, involving reconstruction in the meaning of art. 3 point 7a and construction in the meaning of art. 3 point 6 of the Act of 7 July 1994 on Construction Law. The contract covers the implementation of the investment entitled: "Construction of bicycle infrastructure along the streets: Krasińskiego, Markwarta, Sieńki, Moniuszki, Skłodowskiej-Curie and Łęczyckiej in Bydgoszcz." The contract will be implemented in stages:
1) STAGE I:
a) Section 1 - from Gdańska to the entrance of Staszica with the complete closure of the street; - ensure a detour via Staszica Street; - implement the Staszica intersection halfway; - from Staszica to Ossolińskich implement halfway;
b) Section 2 - from Ossolińskich to Ogińskiego implement halfway; - implement the Ossolińskich roundabout halfway;
c) Section 5 - implementation of the Skrzetuskiego roundabout under traffic;
d) Section 6 - implementation of the roundabout on Łęczyckiej under traffic as well as the entire street from Fordońska to Kamienna;
2) STAGE II:
a) Section 3 and 4 - from Ogińskiego to the Skrzetuskiego roundabout implement halfway with the use of a swing; - implement a temporary single-lane roundabout with right bypasses on selected routes at the Ogińskiego, Moniuszki, Sieńki intersection;
b) Section 5 - from the Skrzetuskiego roundabout to Łęczyckiej together with ul. Kijowska under traffic;
2. The detailed description of the subject of the contract and the conditions for the execution of the contract are contained in the draft provisions of the contract with annexes, constituting Annex No. 1 to SWZ, including: - description of the subject of the contract, design documentation PAB, PZT, PT and technical specifications for the execution and acceptance of construction works, constituting Annex No. 2 to the Contract; - template of the offer form constituting Annex No. 2 to SWZ.
3. The Contracting Authority does not impose an absolute requirement to conduct a site visit, but suggests conducting it in the interest of the Contractor without the participation of the Contracting Authority.
4. The Contracting Authority, in accordance with art. 95 para. 1 of the Pzp, requires that the contractor or subcontractor, during the implementation of the contract (for the entire period of validity of the contract), employ on the basis of an employment relationship, in accordance with the provisions of the Labour Code (art. 22 para. 1), persons directly performing the works, i.e. so-called physical workers, including road workers, industry fitters, general construction workers, operators/drivers of construction machinery and vehicles. This requirement does not apply to persons managing the construction, performing geodetic services, or suppliers of construction materials. The detailed description of the Contracting Authority's requirements in this respect is contained in the draft provisions of the contract, which constitute Annex No. 1 to SWZ.
5. The Contractor may entrust the execution of part of the contract to a subcontractor, with the exception described in point V.11. SWZ. In the scope of subcontracting, the provisions of art. 462-465 of the Pzp apply. The Contractor is obliged to indicate in the Offer and in the JEDZ part of the contract (in % or material scope), the execution of which it intends to entrust to subcontractors, as well as the names of potential subcontractors, if they are already known. The lack of a statement by the Contractor in this regard will mean that the Contractor intends to implement the entire contract independently. The Contractor is liable for the actions, omissions, and negligence of the subcontractor, as for his own actions.
6. The contract is co-financed within the framework of the National Reconstruction Programme and the European Funds Programme for Kujaw and Pomorze 2021-2027.
7. The Contracting Authority reserves the right to limit the material-financial subject of the contract during its implementation (reduce the scope of the contract) by a maximum of 20% of the gross value of the contract. This means that the minimum guaranteed value of the services of the parties (the guaranteed part of the contract) will be not less than 80% of the total gross remuneration indicated in the contract. The limitation of the scope may take place on the conditions specified in the draft provisions of the contract (Annex No. 1 to SWZ). In the event of a limitation of the scope of the contract, the Contractor is entitled to remuneration only for the construction works actually and correctly performed, and the Contractor waives all claims arising from the non-performance of the remaining part of the contract.
8. The Contracting Authority does not provide for the possibility of using the option referred to in art. 441 para. 1 of the Pzp.
9. The Contracting Authority does not provide for the awarding of contracts referred to in art. 214 para. 1 point 7 of the Pzp.
10. The Contracting Authority does not allow the submission of partial offers. The Contracting Authority does not divide the contract into parts. Justification for not dividing the contract into parts: The implementation of the investment project requires implementation within a single task due to the need to ensure close cooperation and inter-branch coordination. The inclusion of individual stages of the investment within a single task will ensure efficient implementation of construction works and limit inconveniences and nuisances for the environment in connection with the implementation of this investment. The construction of bicycle infrastructure within a single contract eliminates problems related to communication between entities and errors resulting from the transfer of materials necessary for the implementation of the subject of the contract. The lack of division into parts does not limit access to the contract for contractors from the MŚP sector.
11. In accordance with the provisions of the Act of 14 June 2024 on the protection of whistleblowers, the Contracting Authority has implemented a procedure for reporting violations of the law and taking subsequent actions, which is described in the Directive No. 20/2024 of the Director of ZDMiKP in Bydgoszcz of 18 September 2024 with annexes available in the Public Information Bulletin of the Municipal Roads and Public Transport Authority in Bydgoszcz https://bip.zdmikp.bydgoszcz.pl/index.php/procedura-zgloszen-w-zdmikp
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – River regulation and flood control works – "Ochrona przeciwpowodziowa doliny rzeki Bystrzycy Dusznickiej i Kamiennego Potoku: Duszniki – Zdrój, Szczytna rz. Bystrzyca Dusznicka”
Państwowe Gospodarstwo Wodne Wody PolskiePolandRiver regulation and flood control worksDeadline in 14 daysPublished on Aug 12, 2026
Poland – Construction work for sports facilities – BUDOWA HALI WIDOWISKOWO-SPORTOWEJ WRAZ Z PODZIEMNYM MIEJSCEM UKRYCIA „U2” PRZYSTOSOWANYM DO PEŁNIENIA ZAMIENNIE FUNKCJI GARAZU PODZIEMNNEGO W ZAWIERCIU
Gmina ZawierciePolandConstruction work for sports facilitiesArchitectural, construction, engineering and inspection servicesArchitectural and related servicesDeadline in 22 daysPublished on Aug 12, 2026
Poland – Construction work – Budowa Komendy Powiatowej Państwowej Straży Pożarnej z siedzibą Jednostki Ratowniczo-Gaśniczej w Nysie
Komenda Powiatowa Państwowej Straży Pożarnej w NysiePolandConstruction workSite preparation and clearance workBuilding installation workDeadline in 12 daysPublished on Aug 12, 2026
Poland – Road construction works – Budowa ścieżki rowerowej i chodnika na ul. Energetyków w ramach zadania „Rozwój infrastruktury mobilności miejskiej na terenie Obszaru Funkcjonalnego Radomia – Etap I”
Miejski Zarząd Dróg i Komunikacji w RadomiuPolandRoad construction worksConstruction, foundation and surface works for highways, roadsEngineering works and construction worksDeadline in 35 daysPublished on Aug 12, 2026