Greece – Construction work – Design and Construction of the Main Terminal Building (MTB) South Pier Expansion, Satellite Terminal Building (STB) Western Extension and Aprons at Athens International Airport
Description
Athens International Airport S.A. (hereinafter called “AIA”) acting in compliance with the Airport Development Agreement, as ratified by Law 2338/1995 (Government Gazette A’202/14.09.95), and subsequently amended and ratified by Laws 4594/2019 (Government Gazette Α΄29/19.02.19) and 5080/2024 (Government Gazette A’ 4/ 16.1.2024) is hereby inviting companies and groups of economic operators, including joint ventures / consortia /associations (“Joint Venture(s) / Consortium(a) / Association(s)”) to tender (the “Tenderer(s)”) for the Works identified in the title above, to be executed at Athens International Airport "Eleftherios Venizelos". The respective contract (the “Contract”) will cover all works, services, specific activities, deliverables, and responsibilities required for the design, construction (including structural, civil, mechanical, electrical, and plumbing works), testing, commissioning, supervision, monitoring, operational readiness and handover of Main Terminal Building South Pier expansion and Satellite Terminal Building Western Extension and the associated Apron Works, including all related airside and landside works, utilities, interfaces and all associated systems installations necessary to ensure the proper completion, full functionality, regulatory compliance, and integration with existing airport infrastructure as described in Scope of Works (” SoW”) and the Employer’s Requirements, together with all associated temporary works, logistics arrangements, construction phasing and operational measures required for their safe and timely implementation within a live and fully operational Airport environment. The scope comprises the MTB South Pier Expansion, the STB Western Extension, the associated Apron Works, and a new permanent underground link (bypass tunnel) around the South Pier Expansion. The link will maintain continuous passenger, goods and waste flows between the MTB and the STB during and after construction. The principal Works, described in detail in the SoW, include, without limitation: Approximately 25,000 m² of new South Pier facilities, including contact and bus gates, commercial areas, CIP lounges and support facilities around the South Oculus; Approximately 950 m² of STB Western Extension, providing two (2) new open bus gates, and the conversion of existing Gates C17–C18 into open gate lounges; • Approximately 1,000 m² of reconfiguration works within the existing MTB; • Additional contact aircraft stands; • New Passenger Boarding Bridges, comprising four (4) single and two (2) double bridges, and the rerouting of the existing Passenger Boarding Bridge serving Stands A12/A13; • Construction of a new permanent underground link between the MTB and the STB; • Downgrading, reconfiguration and partial reconstruction of Taxiway P (former Taxiway India) and partial reconstruction of Taxiway E, together with the associated apron and airside infrastructure works; and Realignment of the service road and replacement of the A13 fixed link bridge.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Greece – Wastewater treatment plant construction work – ΚΕΝΤΡΟ ΕΠΕΞΕΡΓΑΣΙΑΣ ΛΥΜΑΤΩΝ (ΚΕΛ) ΔΗΜΩΝ ΡΑΦΗΝΑΣ – ΠΙΚΕΡΜΙΟΥ ΚΑΙ ΣΠΑΤΩΝ - ΑΡΤΕΜΙΔΑΣ
Ε.ΥΔ.Α.Π. Α.Ε. - ΕΤΑΙΡΕΙΑ ΥΔΡΕΥΣΕΩΣ ΚΑΙ ΑΠΟΧΕΤΕΥΣΕΩΣ ΠΡΩΤΕΥΟΥΣΗΣ Α.Ε.GreeceWastewater treatment plant construction workSewage plant equipmentOperation of a sewage plantDeadline in 33 daysPublished on Oct 28, 2026
Greece – Construction work for water and sewage pipelines – Ε-905
Ε.ΥΔ.Α.Π. Α.Ε.GreeceConstruction work for water and sewage pipelinesAncillary works for water pipelinesDeadline in 4 daysPublished on Oct 27, 2026
Greece – Transformer substation – Έργα Ενίσχυσης στους Υ/Σ ΥΤ/ΜΤ Καλλιστηρίου, Αγιάς και Λαμίας
ΔΙΑΧΕΙΡΙΣΤΗΣ ΕΛΛΗΝΙΚΟΥ ΔΙΚΤΥΟΥ ΔΙΑΝΟΜΗΣ ΗΛΕΚΤΡΙΚΗΣ ΕΝΕΡΓΕΙΑΣ Α.Ε.GreeceTransformer substationHigh voltage installation workMedium-voltage installation workDeadline in 40 daysPublished on Oct 26, 2026
Greece – Pumping station construction work – Modifications, construction of a new pumping station & accompanying infrastructure for the interconnection of Kozani district heating with the unified district heating network of Western Macedonia
ΔΗΜΟΤΙΚΗ ΕΠΙΧΕΙΡΗΣΗ ΥΔΡΕΥΣΗΣ ΑΠΟΧΕΤΕΥΣΗΣ ΚΟΖΑΝΗΣGreecePumping station construction workDeadline in 12 daysPublished on Oct 26, 2026