Germany – Technical planning services – Erweiterung Realschule Peißenberg inkl. Umbau im Bestand - - Leistungen der Technischen Ausrüstung, Anlagengruppen 1, 2 und 3, Lph. 1-9 gemäß §§ 55 ff. HOAI

Landratsamt Weilheim-Schongau, Sb. 10.4 - Vergabe- und BeschaffungswesenGermanyPublished on Jun 11, 2026
No deadline given

Description

Project Description

An outdated temporary building at Realschule Peißenberg is to be demolished. The resulting voids and the additional space required due to increased student numbers will be created through an extension. Realschule Peißenberg is located on a school campus together with Josef-Zerhoch-Grundschule and Josef-Zerhoch-Mittelschule. The latter two schools are owned by the Marktgemeinde Peißenberg. Adjacent to the schools are the Wörth-Turnhalle, the Glückauf-Sporthalle, the sports facilities of TSV Peißenberg and the ice rink. Realschule Peißenberg consists of three interconnected building sections A, B and C from 1950 to 1997. In recent years, some specialist rooms in sections A, B and C have been renovated, and fire protection measures have been implemented, including the installation of fire protection ceilings and doors. As part of Phase 0, workshops were held with representatives of the funding authority and teachers to develop an educational concept. The result is a desire for a modern form of teaching as a learning landscape, with cluster solutions in varying configurations for grades 5 to 8 and 9 to 10. Not only the Landkreis-Realschule has a space requirement, but also the Mittelschule of the Marktgemeinde. In Phase 0, it was worked out as a solution that the four missing classrooms (equivalent to one cluster / learning house) will be integrated into the extension of the Realschule. The construction work must be carried out while the school is in operation. Based on cost indicators, construction costs of approximately 8.9 million € gross (cost groups 300+400, DIN 276) are currently expected. The (provisional) key dates for implementation are as follows: - Start of basic survey: early December 2026, - Construction start: at the latest 1st quarter 2028 - Completion / start of use: at the latest early 2029. It is intended to commission the following services step by step with this tender: Services of the Technical Equipment, Plant Groups 1, 2 and 3, Phases 1-9 according to §§ 55 ff. HOAI. Initially, in the 1st commissioning stage, Phases 1 and 2 according to § 55 HOAI will be commissioned. The further phases (here: Ph. 3-9) will be called up step by step. There is no entitlement to overall commissioning.

CPV codes

Technical planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders