Skip to content
Back to search
This tender has expired.

Hungary – Architectural, engineering and planning services – Pécsi Jan. Pan. Gimn. ép. felújítása - tervezés

Pécs Megyei Jogú Város ÖnkormányzataHungaryPublished on Aug 19, 2026
Deadline passed

Description

The following laws/standards/calls must be applied during the design and planning process:

- Act C of 2023 on Hungarian Architecture

- Act LXIV of 2001 on the Protection of Cultural Heritage

- Government Decree 68/2018 (IV. 9.) on the rules related to the protection of cultural heritage

- Government Decree 449/2025 (XII. 29.) on the rules related to monument protection

- Act LXIX of 2023 on the order of state construction investments

- Government Decree 190/2009 (IX. 15.) on the chief architect activity

- Government Decree 191/2009 (IX. 15.) on the construction industry execution activity

- Government Decree 237/2024 (VIII. 8.) on the designation and operating conditions of construction authorities

- Government Decree 280/2024 (IX. 30.) on the basic regulations of settlement and construction requirements

- Government Decree 281/2024 (IX. 30.) on construction authority procedures and inspections

- Government Decree 283/2024 (IX. 30.) on architectural and settlement planning boards

- Government Decree 176/2008 (VI. 30.) on the certification of building energy characteristics

- ÉKM Government Decree 9/2023 (V. 25.) on the determination of building energy characteristics

- BM Government Decree 54/2014 (XII. 5.) on the National Fire Protection Regulations

- MSZE 24203-3:2012 Hungarian language! Design guidelines for educational institutions. Part 3: Secondary educational institutions

- EMMI Government Decree 20/2012 (VIII. 31.) on the operation of educational and childcare institutions and the use of names of public educational institutions

- "Guideline for Ensuring Equal Access to Public Services – Complex Barrier-Free Design"

- "TOP_Plusz-3.4.1-23 Sustainable Human Infrastructure" call for proposals documentation and general guidelines

- Local Government Decree 12/2022 (IV. 22.) - Pécs County-Level City Building Regulations and Regulatory Plan

- Local Government Decree 20/2023 (VI. 26.) - Pécs County-Level City Townscape Protection and Local Architectural-Technical Planning Board Operation

- Normative Resolution No. 316/2017 (XII.14.) - Pécs County-Level City Council's adopted Townscape Character Handbook

The Winning Bidder will perform the tasks of the designer, as defined in Act LXIX of 2023 on the order of state construction investments, including the preparation of permit drawings and construction drawings, as well as design supervision during the physical implementation of the investment. In this context, the Winning Bidder's task and responsibility, as a general designer, is to involve all specialist designers as subcontractors in the development, to deliver the plans according to the quality and deadline prescribed by the Client, to cooperate in the construction procurement procedure (preparation of annexes to the procurement documentation, answering questions arising during supplementary information, checking bids, participation in evaluation), and to provide design supervision throughout the physical implementation period. - Participation in the handover and acceptance procedure of the worksite - Participation in two on-site cooperations per month, based on the Client's indication (the construction period is approximately 8 months plus the technical handover and acceptance procedure, time available according to the law) - Preparation of as-built drawings related to construction design deviations/deficiencies during construction - Checking for systematic accuracy, i.e., whether the construction works are progressing as recorded in the plans - Facilitating implementation, providing recommendations and warnings regarding factors that hinder or support implementation according to the documentation - Recording in the e-construction diary about on-site observations and whether the construction works comply with the current legal regulations - Participation in the evaluation of technical change notifications, participation in the technical handover and acceptance procedure and the issuance of the closing statement in the e-construction diary - Issuance of a designer's statement upon completion of the permit - With his expertise and experience, the Winning Bidder's task and responsibility is to ensure the necessary consultations with the Client, Chief Architect, Planning Board, and to cooperate in initiating and conducting the necessary official procedures for implementation. The Winning Bidder is responsible for complying with all applicable laws, standards, and guidelines during the design process, and for designing the accountable technical content of the "TOP_Plusz-3.4.1-23 - Sustainable Human Infrastructure" tender call within the available resources. The Winning Bidder has an obligation to inform the Client or the Client's representative regarding the subject of the contract. The monument protection registration number of the building under monument protection: Main Number: 10, Identifier 1760

CPV codes

Architectural, engineering and planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders