Back to search
Germany – Switching station installation work – Neubau Netzkupplung Fischenich; Elektrifizierung Eifelstrecke
DB Energie GmbH (Bukr 31)GermanyPublished on Mar 23, 2026
No deadline givenDescription
The accelerated electrification of the Eifel routes as part of the reconstruction will be implemented by the installation of 2x25 kV feeder lines as part of the overhead line system. This type of railway power supply is novel compared to railway power supply by means of 110 kV railway power lines and substations and is unique so far in the DB Energie power supply network. The planning and construction of, among other things, the Fischenich network coupling is part of the accelerated electrification of the Eifel routes with 2x25 kV feeder lines.
CPV codes
Switching station installation workSwitchgear
Documents & submission
AI summary
Sign in for an AI summaryContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Siteworks – Ministerium für Wirtschaft, Touris., Landwirt. und Forsten des Landes S.- A. / Modernisierung der Überbetrieblichen Ausbildungsstätte in Iden, Baustelleneinrichtung
Ministerium für Wirtschaft, Tourismus, Landwirtschaft und Forsten des Landes Sachsen-AnhaltGermanySiteworksConstruction workDeadline in 29 daysPublished on Sep 07, 2026
Germany – Tiling work – Revitalisierung Bauhaus Trabelsdorf: BAU-11-Fliesenarbeiten
Gemeinde LisbergGermanyTiling workDeadline in 30 daysPublished on Sep 07, 2026
Germany – Floor laying and covering work – Revitalisierung Ringstraße 60 Los 16 Bodenleger
Leipziger Wohnungs-und Baugesellschaft mbHGermanyFloor laying and covering workDeadline in 41 daysPublished on Sep 07, 2026
Germany – Heating, ventilation and air-conditioning installation work – Sanierung Turnhalle Franz-Marc-Schule Geretsried 402 Heizung Sanitär
Landratsamt Bad Tölz - WolfratshausenGermanyHeating, ventilation and air-conditioning installation workGymnasium construction workDeadline in 22 daysPublished on Sep 07, 2026