Germany – Transformer substation – Neubau 380kV luftisolierte Schaltanlage für den Anschluss von Batteriespeicheranlagen als Generalübernehmer
Description
Within the framework of grid connection requests, the connection of three grid applicants to the 380kV grid of TransnetBW at the location PULVE has required the implementation of several measures. This includes the construction of a 380kV air-insulated switchgear of the TBW class "small installation". The switchgear consists of a 2-busbar system, a coupling, and seven switchgear panels. The two circuits 8045 blue Mühlhausen-Pulverdingen and 8021 red Großgartach C2 Pulverdingen are to be looped in via these switchgear panels. With regard to the rated data and the quantity structure for future requirements, the expansion of the existing 380-kV switchgear according to the current TransnetBW standard is not possible. Therefore, the measures can only be realized by the new construction of an air-insulated 380-kV switchgear with an operating building. This contract includes the following deliveries and services for the plants described below: - Complete planning taking into account all project requirements, including all requirements, - Design, calculation and construction, - Creation of all proofs and concepts, - Area securing - Creation and submission of approval documents - Manufacture, tests and inspections, - Delivery, packaging, insurance and transport free to place of use, - Unloading, interim storage, construction site transport, - Construction site setup, - Dismantling, storage or disposal, - Assembly and erection, - Cleaning and corrosion protection, - Assembly supervision, - Acceptance, - Commissioning (IBS), - Commissioning ready for operation (BBÜ), - Preparation and participation in functional tests (FUP) carried out by the AG, - Training and documentation. - Cable entry including approval Air-insulated switchgear 380 kV consisting, inter alia, of: - 2-busbar system - 4 line switchgear panels with loop-in of the circuits mentioned under 1.2 - 3 line switchgear panels for connecting customer plants - Coupling panel - Secondary technology for 7 panels - Additional space for 2 panels (renewal reserve) - Own consumption - Plant infrastructure - Operating building - Relay houses for the 380 kV-AIS switchgear panels and busbar system Clarification: The contractor is responsible for the turnkey handover and proper functioning of the substation. The services listed here only provide a rough overview and do not release the contractor from the obligation to calculate any services necessary for operation/function. Access to the tender documents is restricted. Please register on the procurement platform https://transnetbw.synertrade.com. After successful registration, please contact [email protected]. There you will receive further information. In case of technical problems or questions, please contact [email protected]. Offers or applications for participation are to be submitted electronically via: https://transnetbw.synertrade.com.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Emergency-services building construction work – Neubau Rettungswache Zittau - Los 1 Bauhauptleistungen
Landratsamt GörlitzGermanyEmergency-services building construction workStructural shell workReinforced-concrete workDeadline in 34 daysPublished on Oct 29, 2026
Germany – Harbour construction works – Wassertechnischer Spezialtiefbau
Stadtwerke Kiel AGGermanyHarbour construction worksSheet pilingConstruction work for waterwaysNo deadline givenPublished on Oct 29, 2026
Germany – Theatre construction work – Los 24 - Schlosserarbeiten; Landestheater Altenburg, Theaterplatz 19, 04600 Altenburg, Sanierung Kronenboden
Landkreis Altenburger LandGermanyTheatre construction workMetalworkingDeadline in 39 daysPublished on Oct 29, 2026
Germany – Joinery work – Energetische Sanierung Konradin-Grundschule und Erweiterung um 4 Klassenräume, Barbarossastraße 29 - 31, 87600 Kaufbeuren
Stadt KaufbeurenGermanyJoinery workInstallation of windowsSun-protection worksDeadline in 18 daysPublished on Oct 29, 2026