Netherlands – Construction work for highways, roads – 1-W-0027920-25 Aanleg Verlegde Bosdreef- fase 2

Gemeente RotterdamNetherlandsPublished on Jun 18, 2026
18 days left

Description

The Bosdreef will be realigned in two phases to the north to make way for the new residential area Nieuw Kralingen and a business park. Phase 1 was completed in 2024. These tender documents describe the task and tendering for phase 2. The objective of the Contract is the realisation of phase 2 of the realigned Bosdreef as a full-fledged northern access route (single carriageway, 50 km/h) to replace the current Bosdreef (dual carriageway, 70 km/h). The Contract described in this tender procedure covers: •New road alignment (50 km/h access road) with foundation, surfacing, marking and road furniture •Complete drainage system (surface and waste water) connecting to existing infrastructure •Operational VRI's and public lighting •New, wider concrete Crooswijksebrug (fixed) •Integrated infrastructure system •Complete connection between phase 1 and phase 2 •Permits, inspections, handover documentation and transfer to management (RAW system)

CPV codes

Construction work for highways, roadsDemolition workConstruction work for bridges and tunnels, shafts and subwaysConstruction work for bridgesBridge construction workSewage pumping stations construction workWastewater pumping stationConstruction work for sewage pipesInstallation of traffic lights

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders