Czechia – Solar photovoltaic modules – Instalace nových fotovoltaických elektráren v areálech společnosti ČEPRO, a.s.
Description
The subject of the public contract is the construction, installation, commissioning and full commissioning of photovoltaic power plants (FVE) in the storage areas of the contracting authority, including the complete provision of UPOS and UTP, the preparation of documentation for the execution of the work and documentation of the actual execution of the work and the provision of cooperation with the contracting authority to obtain a subsidy and to negotiate with the ERÚ. The public contract is divided into 4 parts: Part 1 – FVE Nové Město (499.5 kWp), Part 2 – FVE Šlapanov (994.5 kWp), Part 3 – FVE Potěhy (499.5 kWp), Part 4 – FVE Cerekvice (499.5 kWp). The contracting authority requires the supply of SolarEdge technology or another technically equivalent solution allowing full integration into the existing SolarEdge monitoring system. Detailed specifications are given in the tender documentation.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Solar panels – Dodávka a instalace fotovoltaiky Aquapark Děčín, Oblouková 1400/6, Děčín I
Statutární město DěčínCzechiaSolar panelsSolar photovoltaic modulesSolar installationDeadline in 3 daysPublished on Nov 19, 2026
Czechia – Fuels – ZAVEDENÍ DYNAMICKÉHO NÁKUPNÍHO SYSTÉMU NA DODÁVKY POHONNÝCH HMOT
Výzkumný ústav živočišné výroby, v. v. i.CzechiaFuelsPetroleum and distillatesNo deadline givenPublished on Nov 19, 2026
Czechia – Solar installation – Instalace FVE na objektech a pozemku Města Bíliny
Město BílinaCzechiaSolar installationEngineering design servicesEngineering design services for the construction of civil engineering worksDeadline in 24 daysPublished on Nov 19, 2026
Czechia – Solar photovoltaic modules – Fotovoltaická elektrárna pro sklad sena a pavilon afrických kopytníků
Zoologická a botanická zahrada města Plzně, příspěvková organizaceCzechiaSolar photovoltaic modulesSolar installationDeadline in 24 daysPublished on Nov 19, 2026