Skip to content
Back to search

Poland – Construction work – Rowerowe Roztocze. Drogi pieszo-rowerowe w obszarach wiejskich - budowa dróg pieszo-rowerowych i MOR-u w gminach Modliborzyce i Chrzanów

Powiat JanowskiPolandPublished on Nov 17, 2026
4 days left

Description

The subject of the contract are construction works consisting of the execution of the order entitled „Rowerowe Roztocze. Foot and bicycle paths in rural areas – construction of foot and bicycle paths and Bicycle Service Station (BSS) in the municipalities of Modliborzyce and Chrzanów” divided into three parts. The contract includes the execution of construction works related to the construction of foot and bicycle paths in the municipalities of Modliborzyce and Chrzanów and the construction of a Bicycle Service Station (BSS) in the municipality of Chrzanów.

Part 1 – Extension of county roads no. 2804L Modliborzyce – Błażek and no. 2812L Wolica Pierwsza – Branew in the scope of building a foot and bicycle path Modliborzyce – Krzywe Drogi

Description of the investment: The task entitled „Extension of county roads no. 2804L Modliborzyce – Błażek and no. 2812L Wolica I - Branew in the scope of building a foot and bicycle path (Modliborzyce – Krzywe Drogi)” covers the section of the county road no. 2804L from the intersection with the municipal road no. 108739L ul. Zamkowa to the intersection with the county road no. 2812L (on the right side of the road alignment) and the section of the county road no. 2812L from its beginning to the height of the plot no. 453/2 Wolica Pierwsza (on the left side of the road alignment). The planned length of the foot and bicycle path is 4,092 m. The task includes the construction of a foot and bicycle path with an asphalt concrete surface. The target width of the foot and bicycle path will be 3.00 m. As part of the task, due to the need to remove the exposed ditch, the construction of a storm sewer is planned. The project provides for the removal of collisions with telecommunication and power infrastructure, the removal of trees colliding with the investment and planting new ones in non-colliding places. The investment is located in the Lublin Voivodeship, Janowski County, Modliborzyce Municipality, Kolonia Zamek, Wolica Kolonia, Wolica Pierwsza.

Part 2 – Extension of the county road no. 2810L Krzemień – Chrzanów – Goraj in the scope of building a foot and bicycle path (Chrzanów II – Chrzanów I)

Description of the investment: The task entitled „Extension of the county road no. 2810L Krzemień – Chrzanów – Goraj in the scope of building a foot and bicycle path (Chrzanów II – Chrzanów I)” covers the section of the county road no. 2810L from the roundabout (intersection with the county road no. 2809L Chrzanów – Otrocz) in m. Chrzanów Drugi to the intersection with the municipal road no. 108807L in m. Chrzanów Pierwszy with a length of 3,644 m. The task includes the construction of a foot and bicycle path with an asphalt concrete surface and for approx. 113 m with concrete paving blocks without a phase. The target width of the foot and bicycle path will be 2.50 - 3.00 m. The width of the pavement 0.50 m. As part of the task, due to the collision, the street lighting will be rebuilt. The project also provides for the removal of collisions with power and telecommunications networks as well as the reconstruction of culverts under the road crown. The investment is located in the Lublin Voivodeship, Janowski County, Chrzanów Municipality, Chrzanów Pierwszy, Chrzanów Drugi.

Part 3 – Construction of a Bicycle Service Station in the locality of Chrzanów

Description of the investment: The task entitled „Construction of a Bicycle Service Station in the locality of Chrzanów” includes the execution of: 1) one shelter „A”, this is a technical shelter with devices for repairing and charging bicycles (repair station in the middle and charging sockets on the internal walls of the shelter according to the drawings). This shelter will also serve for the regeneration and stop of tourists on bicycles. The shelter contains a bench and a table for a minimum of 3 people. It has an information board MOR and a map of trails, 2) three shelters „B”, these are shelters for the regeneration and stop of tourists on bicycles. The shelters contain a bench and a table for a minimum of 6 people, 3) eight bicycle stands, in which two bicycles can be parked at one, 4) one set of bins for selective waste collection, 5) three monitoring cameras with a sensor installed on existing lighting poles, 6) main power distribution and cable-measuring junction. The detailed scope of works to be carried out is specified in the design documentation attached to the SWZ.

CPV codes

Construction workCycle path construction workFootpath construction workSite preparation and clearance workRoad-surface painting workInstallation of road signsSite preparation workSiteworksRoof-covering workRoof-framing workVarious surface worksElectrical installation workLandscaping workPrefabricated unitsRoad markings

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders