Poland – Roadworks – BUDOWA BEZKOLIZYJNEGO SKRZYŻOWANIA DWUPOZIOMOWEGO POMIĘDZY MIEJSCOWOŚCIAMI JUSTYNÓW I JANÓWKA”
Description
The subject of the contract is the preparation of a complete project documentation and the execution of construction works in the "design and build" system for the task entitled: "Construction of a grade-separated intersection between the localities of Justynów and Janówka" within the project "Improvement of safety at level crossings, including their reconstruction into grade-separated intersections". The investment is located along ul. Główna at the intersection with railway lines no. 17 (Łódź Fabryczna – Koluszki) and no. 25 (Łódź Kaliska – Dębica), in the area of the villages of Justynów and Janówka, gmina Andrespol, powiat łódzki wschodni, województwo łódzkie. The scope of the contract subject includes in particular: • preparation of comprehensive multi-disciplinary project documentation necessary for the implementation of the investment in the "design and build" system, along with obtaining the required approvals, opinions, and administrative decisions, • design and construction of a grade-separated intersection with railway lines no. 17 and no. 25 in the form of a road viaduct over the PKP tracks along the new planned route of ul. Główna and a tunnel for pedestrians and cyclists along the existing route of ul. Główna; • liquidation of the existing level crossing cat. A no. 017 016 046 located at km 16+046 of railway line no. 17 and at km 21+056 of railway line no. 25 along with the accompanying infrastructure and adaptation of the railway traffic control system (srk); • reconstruction of the existing platforms of Justynów station and ensuring access from the planned tunnel to the platforms via stairs and ramps; • expansion and reconstruction of the adjacent road layout (ul. Główna, ul. Lokatorska, ul. Graniczna, ul. Rumiankowa) along with the construction of pavements, parking spaces, and road lighting; • demolition, construction and/or reconstruction of conflicting on-site, underground and above-ground utility networks to the necessary and required extent to enable the implementation of the planned construction project (electrical, telecommunications, traction, gas, water and sewer networks); • construction of technological channels; • construction of drainage for the planned road layout (including a power-generating unit for the needs of the water pumping station), engineering structures, platforms and tracks; • felling of trees and shrubs conflicting with the investment and implementation of compensatory plantings; • obtaining on behalf of the Contracting Authority all necessary administrative decisions, in particular the decision on the permit for the implementation of the road investment (ZRID), the decision on environmental conditions, water law permits, and other legally required consents, agreements, and opinions. The project documentation, which is the subject of the contract, should be prepared in a way that allows obtaining a legally binding decision on the permit for the implementation of the road investment (ZRID), and then implementing the designed construction works in accordance with the law and technical knowledge principles. The Contractor is obliged to obtain on behalf of the Investor a legally binding decision on the permit for the implementation of the road investment (ZRID) or – to the extent that it is not required – a building permit or a notification of the intention to carry out construction works. The Contractor is also obliged to supplement, explain, and correct the prepared documents after submitting applications for the issuance of administrative decisions, opinions, agreements, or permits, until their finality is obtained. The implementation of the task aims to improve road and rail traffic safety, eliminate level crossings, and streamline communication between the localities of Justynów and Janówka.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Realizacja zadania pn.: „Rewitalizacja Parku Lisiniec w Częstochowie – III etap – Budowa strefy rekreacji Pacyfik w Parku Lisiniec”, polegającego na zaprojektowaniu i wykonaniu robót dla zadania prowadzonego w systemie „zaprojektuj i buduj”.
Gmina Miasto CzęstochowaPolandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsBuilding demolition and wrecking work and earthmoving workExcavating and earthmoving workDeadline in 25 daysPublished on Nov 19, 2026
Poland – Construction work for waterways – Tor wodny na rzece Elbląg na odcinku od punktu P1 do punktu Port
Dyrektor Urzędu Morskiego w GdyniPolandConstruction work for waterwaysRiverbank protection worksRiver regulation and flood control worksDeadline in 5 daysPublished on Nov 19, 2026
Poland – Construction work for gas pipelines – Przebudowa gazociągu DN400 MOP 4,22MPa Sędziszów – Tarnów Mościce wraz z odgałęzieniami do stacji gazowych
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.PolandConstruction work for gas pipelinesDeadline in 45 daysPublished on Nov 19, 2026
Poland – Construction work – Odbudowa infrastruktury wodno-kanalizacyjnej uszkodzonej przez powódź na obszarze Gminy Kłodzko.
"Wodociagi Gminy Kłodzko" sp. z o.o.PolandConstruction workEngineering design servicesWater-treatment plant construction workDeadline in 17 daysPublished on Nov 19, 2026