Skip to content
Back to search

Switzerland – Refuse-incineration plant construction work – Ersatz Verbrennungslinie 2 - ET01 Energieversorgung (EV)

INGE CSD / I.C.E. / IBGSwitzerlandPublished on Sep 14, 2026
15 days left

Description

ET01 Power Supply (EV) The subcontract ET01 includes the delivery, installation and commissioning of the central power supply systems for the ErVeL2 project. This includes the essential components of the medium-voltage supply and their connection to the higher-level systems. This includes, among other things: - Transformers (Trafos) - Medium-voltage switchgear - Medium-voltage/low-voltage cabling - Grid control technology - Equipment for synchronising the turbo sets (generators)

CPV codes

Refuse-incineration plant construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders