Skip to content
Back to search

Poland – Surface work for roads – Budowa drogi dla rowerów wzdłuż południowej strony Al. Pokoju

Zarząd Dróg Miasta KrakowaPolandPublished on Nov 18, 2026
14 days left

Description

**Subject of the contract**

a) The subject of the contract is a construction works consisting of the construction of a cycle path on the southern side of Al. Pokoju from Ronda Grzegórzeckiego to Ronda 308 Dywizjonu. As part of the investment, the following must be carried out, among others: • construction of a cycle path, • construction of pedestrian-cycle path sections, • construction and reconstruction of pavement sections, • reconstruction of existing ground reinforcement networks conflicting with the investment, • construction of a technological canal, • felling of existing trees and bushes conflicting with the investment, • execution of vertical, horizontal and road safety devices, • reconstruction of existing traffic lights in connection with the execution of cycle crossings.

b) The Contracting Authority has described the Subject of the Contract using the following attachments: • Draft Contract Terms (PCT), which is Annex 2 to the SWZ, • Technical Specifications for the Performance and Acceptance of Construction Works (STWiORB) which is Annex 6 to the SWZ, • Design documentation which is Annex 7 to the SWZ, • Scope of Works which is Annex 8 to the SWZ, • Supplement to the design documentation which is Annex 16 to the SWZ.

c) Temporary organisation of road traffic – detailing position 59 of the scope of road works: 1) In this position, the costs of two information boards on the co-financing of the project from EU funds under the European Funds for Małopolska programme, as mentioned in §5, paragraph 22 of the PCT, should be taken into account. 2) This position should also take into account the cost of producing and displaying a banner/banners, as mentioned in §5, paragraph 15 of the PCT. The costs mentioned above should be separated in the price offer.

d) Supply and installation of 1 bicycle traffic counter – detailing position 60 of the scope of road works 1) The bicycle traffic counters should consist of the following elements (minimum parameters): a) A sensor with an inductive loop ensuring the counting of cyclists passing through, without distinguishing the direction of travel, and a data logger with a power supply (battery) and a modem for remote data transmission, b) An application for data management, with online access, via the www network, using the http protocol, enabling data viewing and export, as well as enabling data visualisation on any website, including: - reading the number of cyclists counted the previous day, broken down by hours; - reading the number of cyclists counted for a given calendar year. Full access to the data generated and produced by the cyclist counting sets, with the possibility of exporting data to digital files in csv formats. c) Permanently valid codes enabling automatic updating (once a day) on any website of data from the sensors. 2) The data logger should ensure the following functionality: • automatic, daily transmission of data to the data management panel, • be suitable for underground work and meet the requirements of waterproofing, frost resistance and insensitivity to external factors according to the climatic zone constituting the place of installation. 3) The devices should be powered by a battery with a minimum life of 24 months (system consisting of a maximum of 2 loops). 4) The Contractor must submit a description of the functionality of the offered data management panel.

e) Planting of excavated trees - detailing position 1.3.2 of the scope of green works - three-year care of transplanted trees should be taken into account.

f) The Contracting Authority informs that a co-financing agreement has been concluded for the Subject of the Contract from EU funds within the framework of: Project entitled Construction of a cycle path along the southern side of Al. Pokoju co-financed from EU funds under the Operational Programme European Funds for Małopolska for the years 2021-2027.

g) Required warranty period: The minimum warranty period is 48 months. The maximum warranty period is 60 months. Offers with a warranty period of less than 48 months will be rejected.

h) In the event that any of the attachments to the SWZ contain the names of manufacturers, trademarks, standards, approvals, technical specifications and reference systems, the products can be replaced with equivalent ones. The Contracting Authority will consider as equivalent solutions those which enable the effect intended by the Contracting Authority to be achieved by means of other technical solutions. Equivalent solutions cannot be considered to be identical (identical) solutions, but only those which, in the compared features, indicate exactly the same or a very similar useful value. By indicating the names of manufacturers, trademarks, standards, approvals or reference systems, the Contracting Authority intended to define the minimum quality parameters and user characteristics that the goods must meet in order to meet the requirements set by the Contracting Authority and constitute only a quality model of the subject of the contract. By specifying the minimum requirements of quality parameters, the Contracting Authority understands the requirements of goods contained in generally available sources, catalogues, manufacturers' websites, and the like. The use of exemplary manufacturer names is intended only to specify the level of the Contracting Authority's expectations regarding a given solution.

i) Contract execution deadline: within 14 months from the date of the protocol of the handover of the construction site.

j) The Contracting Authority, in accordance with Article 95, paragraph 1 of the PZP, requires the Contractor or Subcontractor to employ, on the basis of an employment relationship, persons performing the activities indicated below, with the exception of persons performing so-called independent technical functions in construction within the meaning of the Construction Law: - lower-level technical staff (organisation and implementation of construction works), - physical workers (direct implementation of construction works). Note! The Contracting Authority allows the possibility of personal implementation of the contract by persons conducting business activity or partners of a commercial company.

CPV codes

Surface work for roadsGeneral construction work for pipelinesConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkInstallation work of illumination and signalling systemsInstallation of road lighting equipmentLandscaping work for green areas

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders