Poland – Solar photovoltaic modules – Budowa instalacji fotowoltaicznych dla oczyszczalni ścieków oraz stacji uzdatniania wody na terenie Gminy Sośnicowice
Description
The subject of the contract is the design, supply and installation of photovoltaic systems with a total capacity of at least 165,545 kWp for the following facilities: 1.1.1. Wastewater treatment plant in Sierakowice (ul. Leśna, 44-156 Sierakowice); 1.1.2. Wastewater treatment plant in Trachy (ul. Raciborska 78, 44-153 Trachy); 1.1.3. Water treatment station in Rachowice (ul. Do Groty, 44-156 Rachowice); 1.1.4. Water treatment station in Sierakowice (ul. Kozielska, 44-156 Sierakowice); 1.1.5. Water treatment station in Sośnicowice (ul. Św. Jakuba, 44-153 Sośnicowice). 1.2. The contract includes services (design work), supplies (equipment supply) and construction works (installation works), with the main service in the current factual state being supplies. 1.3. The subject of the contract and the conditions for its implementation are detailed in: 1.3.1. the functional-user program (PFU); 1.3.2. the planned contractual provisions. 1.4. The list of materials in the functional-user program serves only as an auxiliary function and is not binding for the tender evaluation. 1.5. If the contract documents specify trademarks, patents, origin, sources or specific processes characterizing the products, materials, solutions or services provided by a specific contractor, manufacturer, or standards and other references referred to in Article 101(1)(2) or (3) of the Act, they should be treated as examples, and the Contracting Authority allows the offering of equivalent materials or solutions. Equivalent materials, equipment or solutions are those with parameters not worse than required, and if minimum parameters have not been specified, this means materials, equipment or solutions with similar parameters, suitable for the intended use, including in terms of functional identity, type and quality of materials and technical data. 1.6. The Contracting Authority does not allow the submission of partial tenders for the reasons stated below. This contract is awarded in parts, each of which is the subject of a separate procurement procedure. Each part is characterized by a comprehensive scope of performance in the design and build formula. Allowing partial tenders would result in excessive technical and organizational difficulties arising from the dispersion of the Contractor's responsibility for both its execution and post-sale service (warranty and service). It could also lead to significant differences in the scope of service, supply and construction work standards and quality at the various facilities of the Contracting Authority. It should also be noted that the subject contract has a certain degree of repeatability, which facilitates its execution and allows costs to be reduced if it is not overly diversified. Allowing partial tenders would not increase competitiveness (including increasing accessibility for the SME sector), as this is a small-scale contract that can be executed by the same circle of Contractors from the SME sector as individual elements of the contract. At the same time, the non-admission of partial tenders does not limit competition, nor does it constitute an inconsistency with the provisions of the Pzp. 3.8. The Contracting Authority does not require the submission of the subject evidence with the tender. The method of verifying compliance with the required parameter, referred to in the technical specifications in the PFU, relates to the stage of contract implementation. 3.9. The Contracting Authority does not allow the submission of alternative tenders. 3.10. The Contractor may entrust the execution of part of the contract to a subcontractor. 3.11. In accordance with Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine, it is prohibited to execute a public contract with the involvement of subcontractors, suppliers or entities, on whose capabilities the Contractor relies in the sense of Directive 2014/24/EU, in the event that more than 10% of the contract value falls on them. 3.12. The Contracting Authority does not reserve the obligation for the Contractor to personally perform key tasks.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Electricity – „Dostawa energii elektrycznej dla potrzeb oświetlenia dróg, terenów otwartych, budynków, jednostek organizacyjnych Gminy Miasta Dębica na 2027 rok”
Gmina Miasta DębicaPolandElectricityElectricity, heating, solar and nuclear energyDeadline in 16 daysPublished on Oct 13, 2026
Poland – Fuels – Dostawa opału do kotłowni administrowanych na potrzeby 43 WOG w Świętoszowie.
43 Wojskowy Oddział GospodarczyPolandFuelsCokeCoal and coal-based fuelsDeadline in 33 daysPublished on Oct 13, 2026
Poland – Electricity, heating, solar and nuclear energy – Kompleksowa dostawa energii elektrycznej (wraz z usługą dystrybucji) dla potrzeb jednostek organizacyjnych Powiatu Włocławskiego i Powiatowego Urzędu Pracy we Włocławku
Powiat Włocławski - Starostwo Powiatowe we WłocławkuPolandElectricity, heating, solar and nuclear energyElectricityElectricity distributionDeadline in 27 daysPublished on Oct 13, 2026
Poland – Electricity, heating, solar and nuclear energy – Przetarg nieograniczony na dostawę i odkup energii elektrycznej - Grupa Zakupowa nr 177/2026 Voltra
Voltra S.A. - Pełnomocnik ZamawiającychPolandElectricity, heating, solar and nuclear energyElectricityDeadline in 34 daysPublished on Oct 13, 2026