Poland – Construction work – Zaprojektowanie (w zakresie branży srk) i kompleksowe wykonanie robót budowlanych na linii kolejowej nr 622 na odcinku G Gdów – Szczyrzyc w ramach Projektu pn. „Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark / Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II”
Description
The subject of the Contract is the execution of the following elements: The subject of the Contract is the execution of the following elements: Design and execution of works for the task entitled: "Construction of the building object entitled: railway line no. 622 Gdów – Szczyrzyc on section G from km 17+487 to km 32+854 along with technical infrastructure along railway line no. 622 on the section from km 17+036 to km 32+973 and railway line no. 623 sub-section Fornale – Szczyrzyc on section G from km 9+668 to km 10+105 along with technical infrastructure along the railway connection no. 623 on the section from km 9+668 to km 10+105". The entire subject of the Contract includes the execution of the following elements:
1) Design documentation, including: a) preparation of the executive project, b) preparation of post-construction documentation, including geodetic post-construction documentation, 2) and works in the scopes described in the OPZ and PFU: a) superstructure and sub-ballast, b) drainage and hydrotechnical works, c) external networks, d) roads, e) railway traffic control devices (srk), f) telecommunications devices and systems, g) traction network and power supply and control system, h) non-traction line (LPN); i) electrical power devices and systems up to 1 kV, j) engineering structures along with related works, including railway tunnels, k) platforms, passenger service facilities and cubic structures, l) crossings and level crossings, m) geological and geotechnical works, n) works related to the execution of small architecture elements, o) tree and shrub felling and environmental works, p) all other works necessary for the realization of the task in accordance with the applicable regulations. 3) works consisting of the construction of objects serving environmental protection. 4) conducting the conformity assessment process of structural subsystems in the scope covered by the contract at each stage (design, construction and final subsystem tests) and submitting the appropriate declarations of verification WE and WE verification certificates for subsystems. The Interface Option includes the implementation of cooperation with other contractors carrying out construction works or supplies for the Contracting Authority, which require integration with railway traffic control devices installed as part of this task. Cooperation will take place through the Contracting Authority and/or the Engineer. The Contracting Authority envisages that the scope of works carried out under other Contracts affects the need to make, inter alia, changes in the scope of interfaces (i.e. implementation within this task of the Interface Option). The detailed scope of the Interface Option is defined in Section no. 5 of TOMU IV — PFU entitled: "Forecasted changes in the scope of interfaces", which relate to srk devices planned to be installed as part of this contract. 2. The Detailed Description of the Subject of the Contract is presented in the Description of the Subject of the Contract constituting Tom III of this SWZ and the Functional-User Program (PFU) constituting Tom IV of this SWZ. 3. The Contracting Authority envisages granting contracts, as referred to in art. 388 point 2) lit. c) of the Act. The scope of contracts, as referred to in art. 388 point 2) lit. c) of the Act and the conditions on which they will be granted is defined by the OPZ and PFU. A similar contract may be granted in the form of a contract from free hand, after prior negotiation with the Contractor, in particular in the scope of the contract conditions including price, execution time, guarantee period/retention period and will consist of repeating similar executive projects of the srk industry and comprehensive construction works in accordance with the subject of the contract, in particular in the scopes: a) dismantling and liquidation of railway infrastructure in poor technical condition, devastated, unused cubic structures and elements colliding with design solutions, b) execution of construction works covering the track industry with drainage, the industry of engineering structures (including tunnels) along with the execution of hydrotechnical works in their vicinity, the road industry, the electrical industry, the traction network industry, the traction network power supply industry, the telecommunications industry, passenger service facilities and cubic structures along with surface drainage of the area, the sanitary industry, the srk industry, c) removal of collisions with networks of various operators.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – „Rozbudowa Wojewódzkiego Szpitala Specjalistycznego Im. Św. Jadwigi w Opolu Centrum Psychiatrii Dla Dzieci i Młodzieży„
Wojewódzki Szpital Specjalistyczny im. Św. Jadwigi w OpoluPolandConstruction workHospital facilities construction workBuilding construction workDeadline in 16 daysPublished on Oct 13, 2026
Poland – Tramline construction works – Wykonanie robót dla zadania pn.: „1.37 Remont torowiska tramwajowego w ul. Legnickiej od ul. Sokolniczej do pl. Strzegomskiego”.
Miejskie Przedsiębiorstwo Komunikacyjne Spółka z ograniczoną odpowiedzialnością działająca jako pełnomocnik Gminy WrocławPolandTramline construction worksSurface work for streetsDeadline in 34 daysPublished on Oct 13, 2026
Poland – Construction work – Przedmiotem postępowania i zamówienia jest realizacja II Etapu inwestycji pn. „Modernizacja i przebudowa budynku Centrum Kultury Rotunda w Krakowie”, obejmująca wykonanie robót budowlanych i instalacyjnych, dostaw, montażu wyposażenia i urządzeń, a także uruchomienie, regulację, próby, odbiory i przekazanie obiektu do użytkowania.
Uniwersytet JagiellońskiPolandConstruction workBuilding completion workOther building completion workDeadline in 13 daysPublished on Oct 13, 2026
Poland – Construction work – Rozbudowa dróg powiatowych ulicy Katowickiej oraz ulicy Wojska Polskiego wraz z budową zintegrowanego centrum przesiadkowego „Mijanka” w Świętochłowicach
Gmina ŚwiętochlowicePolandConstruction workSite preparation workBuilding demolition and wrecking work and earthmoving workDeadline in 8 daysPublished on Oct 13, 2026