Skip to content
Back to search

Germany – Load-bearing structure design services – Sanierung und Erweiterung Grundschule + Sporthalle Waffenbrunn – Leistungen der Tragwerksplanung gemäß §§ 49 ff. HOAI // Lph. 1-6

Gemeinde WaffenbrunnGermanyPublished on Oct 04, 2026
No deadline given

Description

The municipality of Waffenbrunn has decided to comprehensively renovate and future-proof the primary school at the Waffenbrunn site. In addition, the school is to be equipped and expanded to meet the requirements of full-day care. Furthermore, the renovation of the existing sports hall is planned. The necessary renovation and expansion measures are to be carried out during ongoing school operations. Suitable construction phases as well as interim and relocation concepts are to be provided if necessary. The school building with the administrative wing in Waffenbrunn was built in 1950 and expanded with an entrance area in 1980. In 2010, the school building was generally renovated, with the exception of the administrative wing. The adjacent sports hall, which is part of the contract-related services, was built in 1980. The school building, including the administrative wing, was constructed in solid construction. The facade and the roof are insufficiently or not insulated at all. Whether there are harmful substances cannot be conclusively answered at this point. The technical building equipment is outdated and requires a general overhaul. In addition to fire protection deficiencies, deficiencies in terms of accessibility were also identified in the feasibility study. In this context, the retrofitting of an elevator is planned. The school will presumably be supplied via a district heating network from the local woodchip plant. In addition to the renovation of the existing building, expansion measures are planned to cover the future space and area requirements, particularly with regard to the full-day care requirement. Furthermore, the existing sports hall is to be comprehensively renovated and adapted to the current technical, energy and functional requirements. The milestones for implementing the project are as follows: - Start of services: Jan 2027 - Start of construction: March 2028 - Completion: Oct 2029. Currently, total costs (excluding indexation for the execution period) of approximately 8.54 million € gross (cost group 200-700, DIN 276) are estimated and are broken down as follows: - Cost group 200 approx. 20,000 € - Cost group 300 approx. 4,940,000 € - Cost group 400 approx. 1,647,125 € - Cost group 500 approx. 380,000 € - Cost group 600 approx. 126,000 €. It is intended to award the following services with this tender: Structural design - Performance phases 1 to 6 according to §§ 49 ff. HOAI. The services will be commissioned in stages. Initially, in the 1st commissioning stage, the performance phase 1-2 according to § 51 HOAI will be commissioned. The performance phases 3-6 will be called up in stages. There is no legal entitlement to the overall commissioning.

CPV codes

Load-bearing structure design services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders