Skip to content
Back to search

Poland – Construction work – Opracowanie dokumentacji projektowej i realizacja robót budowlanych w zakresie podsystemu "Energia" - sieć trakcyjna na linii kolejowej nr 85 odc. Warszawa - Łódź

Centralny Port Komunikacyjny sp. z o.o.PolandPublished on Oct 27, 2026
No deadline given

Description

The subject of the Contract is the preparation of Project Documentation and the implementation of construction works aimed at building an overhead contact line, including power supply elements, autotransformer cabins and control of overhead contact line joints, KDP, on the section Kotowice – CPK Railway Hub – Łódź, and on the sections connecting to the existing/implemented by PKP PLK, along with the reconstruction of the existing PKP PLK infrastructure at the connection points to the extent necessary for implementation. Furthermore, the Contractor is obligated to obtain a WE verification certificate for the Energy subsystems, issue the appropriate verification declarations, and prepare all necessary documentation required to obtain a permit for the admission of the Energy subsystems to indefinite operation. The operational and design speed of the line is 350km/h.

CPV codes

Construction workElectrical installations for railwaysSubstation construction workRailway construction worksConstruction work for electricity power linesEngineering design services for mechanical and electrical installations for buildingsEngineering design services for the construction of civil engineering works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders