Germany – Construction work – PSA Profischule Campus - Haus A - Holzbau- und Fassadenarbeiten
Description
The Profilschule, together with the canteen and the sports hall and facilities, forms the school centre. It was built between 1963 and 1971, expanded several times, and used for a long time by a Realschule. With the closure of the Realschule on 31.7.2016, the new school type (Profilschule) has been using the former buildings. To concentrate the Profilschule location in Ascheberg, the former Hauptschule in Herben will be abandoned. For this, the existing buildings must be expanded, renovated and refurbished. The new location will consist of three buildings (Building A (2), Building B (3) and Building C (1)) plus an auxiliary building of light construction. Building A (2) will be a refurbished existing building upon completion of the measure, Building C (1) and Building B (3) will each be a new building.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Siteworks – Ministerium für Wirtschaft, Touris., Landwirt. und Forsten des Landes S.- A. / Modernisierung der Überbetrieblichen Ausbildungsstätte in Iden, Baustelleneinrichtung
Ministerium für Wirtschaft, Tourismus, Landwirtschaft und Forsten des Landes Sachsen-AnhaltGermanySiteworksConstruction workDeadline in 29 daysPublished on Sep 07, 2026
Germany – Tiling work – Revitalisierung Bauhaus Trabelsdorf: BAU-11-Fliesenarbeiten
Gemeinde LisbergGermanyTiling workDeadline in 30 daysPublished on Sep 07, 2026
Germany – Floor laying and covering work – Revitalisierung Ringstraße 60 Los 16 Bodenleger
Leipziger Wohnungs-und Baugesellschaft mbHGermanyFloor laying and covering workDeadline in 41 daysPublished on Sep 07, 2026
Germany – Heating, ventilation and air-conditioning installation work – Sanierung Turnhalle Franz-Marc-Schule Geretsried 402 Heizung Sanitär
Landratsamt Bad Tölz - WolfratshausenGermanyHeating, ventilation and air-conditioning installation workGymnasium construction workDeadline in 22 daysPublished on Sep 07, 2026