Czechia – Smelting furnaces – Nová huť – Melt Shop Technology
Description
The subject of the public contract is the supply of an electric arc furnace (EAF) with a 200-ton capacity, including all associated facilities as its steelmaking facilities. The requirement is to have a steelmaking furnace designed for flexibility, where the input charge mix shall be flexible, allowing a ratio of 100% Scrap, 75% Scrap + 25% DRI/HBI, or 50% Scrap + 50% DRI/HBI, as per requirement. The requirement further stipulates that there is an external scrap pre-heating facility. Scrap shall be supplied from the existing scrap yard through the existing rail route (approximately 80-90%) and by truck (approximately 10-20%). The steel produced will be dispatched to the two existing continuous casting machines (CCM1 or CCM2) or in the future via one new billet CCM (CCM4) instead of CCM1. Secondary metallurgy shall be handled via at least one new twin ladle furnace and via a new twin VD station (twin tank, twin cover, one common set of mechanical pumps).
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Miscellaneous general and special-purpose machinery – Dodávka kompaktoru a odkup použitého kompaktoru - opakování
Technické služby Zlín, s.r.o.CzechiaMiscellaneous general and special-purpose machineryDeadline in 33 daysPublished on Oct 15, 2026
Czechia – Lifts – Přístavba výtahu k objektu DPS Čs. tankistů 206/9, Praha – Dolní Měcholupy
Městská část Praha-Dolní MěcholupyCzechiaLiftsLift installation workDeadline in 31 daysPublished on Oct 15, 2026
Czechia – Heat pumps – Snížení energetické náročnosti areálu firmy TESLA Mladá Vožice a.s. - vytápění
TESLA Mladá Vožice a.s.CzechiaHeat pumpsHeating, ventilation and air-conditioning installation workDeadline in 38 daysPublished on Oct 15, 2026
Czechia – Refrigerating and freezing equipment – Box chladící vestavěný – Opakovaná II
Všeobecná fakultní nemocnice v PrazeCzechiaRefrigerating and freezing equipmentDeadline in 33 daysPublished on Oct 14, 2026