Skip to content
Back to search

Germany – Switching station installation work – MPI für Sicherheit und Privatsphäre, Bochum - Institutsneubau: Mess-, Steuer- und Regelungstechnik (MSR) / Gebäudeautomation

Max-Planck-Gesellschaft Abt.IIIGermanyPublished on Sep 03, 2026
41 days left

Description

Measurement, Control and Regulation Technology (MSR) / Building Automation

Establishment of the measurement, control and regulation technology for the technical systems of the trades HZG/KLT, Sanitary and RLT. Implementation of the building automation with automation stations, information hubs, control cabinets, operating and display devices, as well as field devices for the detection, control, regulation, monitoring and fault reporting of the technical systems. Integration and control of the heating, cooling, ventilation, sanitary and media supply systems including pumps, valves, dampers, volumetric flow controls, temperature, pressure, humidity and differential pressure measurements, as well as metering and metering devices. Connection of data points and interfaces to the building automation / GLT including parameterization, commissioning, functional testing and documentation. Integration of necessary interfaces to third-party systems and technical systems, in particular to ventilation units, chillers, district heating / district cooling transfer, roof units, safety and operational monitoring, as well as metering and energy management systems.

With maintenance contract

The execution is to commence: within 12 working days after receipt of the invitation by the client (§ 5 Abs. 2 Satz 2 VOB/B); the invitation will presumably be sent to you by 04.11.2026. The work is to be completed (ready for acceptance): within 240 working days after the above-mentioned deadline for the start of execution. (5 working days/week)

Special note regarding tender questions due to special external events (e.g. SARS-COV-2 or Ukraine War): Please consider possible or recognizable impairments in your offer, e.g. in terms of the availability of materials and products, workforce, a possibly delayed submission of required evidence, impacts on any subcontractors, etc. Questions arising in this context, we ask to be submitted in good time before the deadline for submission via the messaging system of the eTendering.

CPV codes

Switching station installation workElectrical engineering installation worksAutomation system

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders