Germany – Dyke construction work – Elbdeicherhöhung Hinterbrack; Deichbau - 1. Bauabschnitt (0+000 bis 0+500)

Deichverband der II. Meile Alten LandesGermanyPublished on Oct 18, 2026
28 days left

Description

Increase of the Elbe dike over a length of 500 m. Setting up the construction site with the creation of a temporary dike crossing, bypass, drift removal path and turning area. Earth transport and installation for the dike construction, road construction of the drift removal path, dike crossing and dike crown path. Traffic safety and control measures are to be carried out during work on the nearby Kreisstraße 39. Creation of the outer runoff area for the newly constructed Siel Hinterbrack, execution of the superstructure and earthworks in the tidal area. Demolition and dismantling of the existing outlet area of the Siel in the superstructure area above the ground level. Demolition and earthworks are also to be carried out to separate the existing old pipeline of the structure in the foreland. See additionally the schedule of services and construction progress plans.

CPV codes

Dyke construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders