Germany – Electrical fitting work – Elektroinstallationen BT B Gymnasium II - Erweiterung Schulzentrum Steinlach-Wiesaz in Dußlingen
Description
On the site of the Steinlach-Wiesaz school centre on the south-eastern outskirts of Dusslingen, the existing community school and parts of the Gymnasium are being renovated and expanded with three new school buildings. As part of the construction measure, the access and courtyard areas as well as the bus stop are also being redesigned. In the first construction phase, the new construction of the community school was completed. In the currently second construction phase, the demolition of the northern specialist classroom building with garden shed and subsequent new construction of the specialist classroom building of the Karl von Frisch Gymnasium (Bauteil B) and the new construction of the connecting building to the existing Bauteil A of the Gymnasium are planned. /// Existing: The Gymnasium consists of four two-storey buildings (BT A, BT B, BT C and BT D/E) and a single-storey garden shed. The individual buildings are made in modular construction and their layouts are based on a grid of isosceles triangles, which are joined together in a honeycomb pattern. /// The two southern classroom buildings C and D/E and the northern specialist classroom building B are grouped around the central access, administration and auditorium building A. The single-storey garden shed is docked to the specialist classroom building B in the area of its north-western facade corner. /// New construction: The planned new specialist classroom building BT B of the Gymnasium consists of a two-storey rectangular main building with a green roof, which is connected to the existing administration and auditorium building A of the Gymnasium via a two-storey connecting corridor and a new two-storey extension on the south-east facade. The specialist classrooms are arranged on all four sides around the outer facades of both floors, thus forming an inner courtyard with a separate WC core. The specialist classroom new building consists of a ground floor and a first floor, as well as a partial basement, in which only the technical control centre is housed. The specialist classroom new building, incl. the externally four-sided surrounding escape balcony on the 1st floor, extends from south-west to north-east over a width of approx. 40.50 m and from south-east to north-west a length of approx. 35.50 m. The ground floor height of the school new building is approx. 3.90 m and in the 1st floor up to the extensively green roof with a floor height of approx. 4.00 m. /// /// This notice covers the services for the electrical installations of the new building Bauteil B specialist classroom Gymnasium and new connecting building to the existing BT A.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Siteworks – Ministerium für Wirtschaft, Touris., Landwirt. und Forsten des Landes S.- A. / Modernisierung der Überbetrieblichen Ausbildungsstätte in Iden, Baustelleneinrichtung
Ministerium für Wirtschaft, Tourismus, Landwirtschaft und Forsten des Landes Sachsen-AnhaltGermanySiteworksConstruction workDeadline in 29 daysPublished on Sep 07, 2026
Germany – Tiling work – Revitalisierung Bauhaus Trabelsdorf: BAU-11-Fliesenarbeiten
Gemeinde LisbergGermanyTiling workDeadline in 30 daysPublished on Sep 07, 2026
Germany – Floor laying and covering work – Revitalisierung Ringstraße 60 Los 16 Bodenleger
Leipziger Wohnungs-und Baugesellschaft mbHGermanyFloor laying and covering workDeadline in 41 daysPublished on Sep 07, 2026
Germany – Heating, ventilation and air-conditioning installation work – Sanierung Turnhalle Franz-Marc-Schule Geretsried 402 Heizung Sanitär
Landratsamt Bad Tölz - WolfratshausenGermanyHeating, ventilation and air-conditioning installation workGymnasium construction workDeadline in 22 daysPublished on Sep 07, 2026