Skip to content
Back to search

Poland – Solar photovoltaic modules – Innowacyjne OZE w Gminie Narewka

GMINA NAREWKAPolandPublished on Nov 18, 2026
40 days left

Description

The subject of the contract is the supply, along with the execution of necessary accompanying works and commissioning, of the following renewable energy installations for the following entities: 1) Kayak Station and Tourist Base in Narewka (Hajnowska 33, 17-220 Narewka), involving the execution of: a) a photovoltaic installation with a capacity of 20 kWp and an electrical energy storage system with a capacity of 25.6 kWh equipped with an EMS system, b) a brine-water heat pump installation with a capacity of 57.1 kW, 2) Municipal Health Centre in Narewka (Kolejowa 1, 17-220 Narewka), involving the execution of a photovoltaic installation with a capacity of 32.8 kWp and an electrical energy storage system with a capacity of 30.7 kWh equipped with an EMS system, 3) Municipal Cultural Centre (Nowa 3a, 17-220 Narewka) in Narewka with a capacity of 7.2 kWp and an electrical energy storage system with a capacity of 10 kWh equipped with an EMS system. as part of the project titled Innovative Renewable Energy in the Municipality of Narewka. 2. The detailed description and the manner of execution of the subject of the contract is specified by: 1) The detailed description of the subject of the contract, including a list of the minimum required technical and operational parameters of the installations mentioned in point 1, specifies: a) design documentation, which includes: − electrical and sanitary technical design, − geological works design, − Annex No. 11 to SWZ – Minimum technical requirements, − diagrams – electrical sector – photovoltaic installations, − technical specification of execution and acceptance of works (STWiOR) / Detailed Technical Specification (SST): (a) electrical sector – photovoltaic installations, (b) sanitary sector – heat pump installation. b) scope of works – indicating the range of required works: − electrical sector, − sanitary sector. constituting an annex to SWZ, (scope of works – an auxiliary document specifying the expected quantities of works, where the scope of the subject of the contract results from the entirety of the design documentation, technical requirements and other provisions of SWZ), 3) the essential contractual provisions, hereinafter referred to as IPU, which constitute an annex to SWZ. 3. Common Procurement Vocabulary - CPV: 09 331 200-0 Solar photovoltaic modules 09 332 000-5 Solar installations 45 311 200-2 Electrical installation works 45 315 600-4 Low voltage installations 45 315 300-1 Electrical supply installations 45 31 110-1 Electrical cabling works 45 15 100-9 Electrotechnical installation works 42 51 111 0-5 – Heat pumps 42 53 000 0-0 – Components of refrigerating and heat pump equipment 45 33 100 0-6 – Installation of heating, ventilation and air conditioning equipment 45 30 000 0-0 – Building installation works 45 31 000 0-3 – Electrical installation works 31 12 111 0-4 – Power converters (inverters, energy storage systems) 31 40 000 0-0 – Batteries, accumulators (often a more precise code for storages) 4. The subject of the contract shall be executed in accordance with the DNSH principle and the implementation of the pre-audit assumptions. 5. The contracting authority, in accordance with Article 100(1) of the Public Procurement Law, has carried out an analysis of the subject of the contract in terms of taking into account the requirements related to accessibility for people with disabilities and design for all users. Due to the technical and specialist nature of the software used to monitor the operating parameters of the photovoltaic installation, energy storages and heat pump, the accessibility requirements have been limited to the functionalities that can be ensured within the standard version of the software. The contracting authority considered it reasonable to take into account, in particular, the readability of the presented data, appropriate marking of interface elements, the possibility of operating basic functionalities using the keyboard and enlarging the content. At the same time, taking into account the principle of effective and rational expenditure of public funds, the contracting authority does not provide for the financing of individual software modifications, the purchase of additional accessibility modules or separate WCAG certification.

CPV codes

Solar photovoltaic modulesHeat pumps

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders