Romania – Solar installation – Furnizare, montare, instalare, testare și punere în funcțiune a sistemului fotovoltaic aferent obiectivului „IMPLEMENTAREA UNEI NOI CAPACITĂȚI DE PRODUCȚIE DE ENERGIE ELECTRICĂ DIN SURSE REGENERABILE CEF 300KW-LOCALITATEA VALEA IAȘULUI, JUDEȚUL ARGEȘ’’
Description
The photovoltaic system will consist of a total of 480 photovoltaic panels, each with a nominal power of 625W (watt). The panels will be placed on a metal structure anchored to the ground, oriented to maximize solar radiation capture throughout the day. The chosen configuration ensures a high efficiency in converting solar energy into electrical energy and increased durability over time, with the panels designed to withstand various climatic conditions. The total installed power at the level of the photovoltaic field (panel level) will be 300.0 kWp (kilowatt-peak), which reflects the maximum capacity for generating electrical energy under standard test conditions (STC). For converting the energy produced by the panels from direct current to alternating current usable in the grid or for self-consumption, the system will be equipped with three (three) high-efficiency inverters, each with a power of 100 kW. Therefore, the total installed power at the level of the inverter system will be 300.0 kW, ensuring adequate capacity for taking up and converting the energy generated by the photovoltaic field, with a technical reserve that allows operation under peak conditions and optimization of the overall performance of the plant. The system has been designed to allow for easy integration into the local electrical grid and to support the self-consumption needs of the community infrastructure. The selection of technical components was made based on an energy and economic feasibility analysis, taking into account the climatic specifics of the area, solar radiation conditions, and the objective of maximum efficiency in operation. This technical configuration will allow not only the constant production of green energy but also efficient control of the energy flow, through intelligent inverters that monitor the essential parameters of the system and contribute to safe, durable, and economical operation of the photovoltaic power plant. The evacuation of the electrical energy produced by the photovoltaic plant will be carried out through a connection point to the electrical grid established at the 20kV voltage level, in the 20kV line cell provided for in PC 20kV CEF Valea Iasului. This technical solution has been approved by ATR no. 001500044662/29.04.2025. The works for the implementation of the connection installation from the technical connection notice will be carried out within the framework of another project. The requirements of the PT will be respected.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Romania – Electricity – Furnizarea energiei electrice de joasa tensiune, inclusiv transportul și distribuirea acesteia, pentru punctele de consum aflate în proprietatea Municipiului Drăgășani
MUNICIPIUL DRAGASANIRomaniaElectricityDeadline in 31 daysPublished on Oct 15, 2026
Romania – Solar installation – Furnizare și montare sistem fotovoltaic 2,7 Kw cu stocare DS Arges
Regia Națională a Pădurilor – Romsilva, prin Direcția Silvică ArgeșRomaniaSolar installationDeadline in 32 daysPublished on Oct 14, 2026
Romania – Fuels – Acord cadru furnizare combustibili
DIRECȚIA GENERALĂ DE SALUBRITATE SECTOR 3RomaniaFuelsDeadline in 32 daysPublished on Oct 12, 2026
Romania – Unleaded petrol – Benzină și motorină cu livrare pe baza de carduri de credit
COMPANIA NATIONALA "ADMINISTRATIA PORTURILOR MARITIME" SA CONSTANTARomaniaUnleaded petrolDiesel fuelDeadline in 10 daysPublished on Oct 12, 2026