The subject of the contract is the construction of a pedestrian and cycle path 316.70 m long along an internal municipal road with exits from the provincial road at km 77+268.20 and 77+614.95, as well as the reconstruction of the internal road with an exit from the provincial road at km 77+623.60, the extension of the existing culvert under the municipal road crown by 3 m at km 0+222.50 (municipal road mileage) along with the replacement of the superstructure with a Ø1000 PP SN-8 pipe with concrete headwalls, and the construction of a culvert under the road for pedestrians and cyclists at km 77+268.20 with a diameter of Ø600 and a length of 12.5 m made of PP SN-8 pipe with an angled inlet and outlet, and clad with concrete paving stones on a cement mortar. Along the road, directly next to the curb on the left side, a pedestrian and cycle path 3.0 m wide (clear width) made of bituminous mass should be built, separated from the carriageway by a 15 cm concrete curb and on the other side by an 8 cm concrete edge. The existing earth-surfaced road should be levelled and given a slope towards the escarpment, while the section of the carriageway made of bituminous mass should be levelled/surfaced and new layers of AC laid. The regulation and levelling of the carriageway with a width of up to 2.5 m of the earth-surfaced road should be carried out with slopes. The exit from the provincial road and the internal road from km 0+294.50 to 0+321.60 should be made of asphalt concrete. Along the road, a pedestrian and cycle path 3.0 m wide (clear width with curb and edge 3.23 m) should be built, separated from the carriageway by a 15 cm concrete curb on a concrete bench with support and on the other side by an 8 cm concrete edge on a concrete bench with support. On the section where the pedestrian and cycle path does not directly adjoin the internal road, it should be bounded on both sides by an 8 cm concrete edge on a concrete bench with support. The planned width of the pedestrian and cycle path allows for the free overtaking of slowly moving persons, so there is no need to design widenings or passing places. The length of the pedestrian and cycle path to be built is 316.70 m. Drainage: Along the length of the planned works, the following is designed: - the extension of the existing culvert with a diameter of Ø1000 by 3 m along with the replacement of the superstructure with Ø1000 pipes made of PP with concrete headwalls. A water permit has been obtained for the planned scope of works. The drainage of the road has been directed through a transverse slope towards the adjacent lower-lying terrain. The drainage of the pedestrian and cycle path has also been directed through a transverse slope towards the adjacent lower-lying terrain. - the construction of a culvert with a diameter of Ø600 and a length of 12.50 m made of PP SN-8 pipe with an angled inlet and outlet, and clad with concrete paving stones on C12/15 concrete. A water permit has been obtained for the planned scope of works. The drainage of the exits has been directed through a transverse and longitudinal slope towards the adjacent open ditch or lower-lying terrain. The design documentation is adapted to the identified needs of people with disabilities and is in line with the concept of universal design. The Contracting Authority provides for the requirements indicated in Article 95(1) regarding the employment by the Contractor or subcontractor, under an employment contract, of persons performing the activities referred to in Chapter XXIV of the SWZ in the context of the implementation of the contract. The Contracting Authority does not allow for the submission of partial tenders - a detailed justification is contained in the SWZ. Contract completion date – within 4 months from the date of signing the contract. The Contractor is bound by the tender until 06.01.2027. In accordance with Article 13(1) and (2) of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation) (OJ EU L 119 of 04.05.2016, p. 1), hereinafter referred to as the "GDPR", the Contracting Authority informs that: 1) The Mayor of Lubycza Królewska, with its registered office at ul. Kolejowa 1, 22-680 Lubycza Królewska, is the data controller of the Contractor's personal data and the personal data of the persons whose data the Contractor has provided in this procedure; 2) In matters relating to the protection of personal data, you may contact the Data Protection Officer, at the email address: [email protected] or by post to the address of the Administrator (detailed information is contained in Chapter XXVII of the SWZ). The Contracting Authority does not provide for partial payments. The Contracting Authority provides for the application of the so-called reverse procedure, referred to in Article 139(1) of the Act, i.e. the Contracting Authority first carries out an examination and evaluation of the tenders, and then carries out a subject qualification of the Contractor whose tender has been highest evaluated, in terms of the absence of grounds for exclusion and the fulfilment of the conditions for participation in the procedure. In accordance with Article 139(2) of the Act, the Contractor is not obliged to submit with the tender a declaration referred to in Article 125(1) of the Act. This declaration will be required only from the Contractor whose tender is highest evaluated.

CPV codes

Cycle path construction workFootpath construction workSite preparation workWorks for complete or part construction and civil engineering workRoad construction works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders