Poland – Cycle path construction work – Przebudowa drogi gminnej w zakresie budowy drogi dla pieszych i rowerów w m. Siedliska, gmina Lubycza Królewska w ramach zadania: Rowerowe Roztocze. Drogi pieszo-rowerowe w obszarach wiejskich
Description
The subject of the contract is the construction of a pedestrian and cycle path 316.70 m long along an internal municipal road, including exits from the provincial road at km 77+268.20 and 77+614.95, as well as the reconstruction of the internal road with an exit from the provincial road at km 77+623.60, the extension of the existing culvert under the municipal road crown by 3 m at km 0+222.50 (municipal road kilometrage) with the replacement of the crossing part with a Ø1000 PP SN-8 pipe with concrete headwalls, and the construction of a culvert under the pedestrian and cycle path at km 77+268.20 with a diameter of Ø600 and a length of 12.5 m with a PP SN-8 pipe with an inlet and outlet cut at an angle and lined with concrete paving stones on a cement mortar. Along the road, directly next to the curb on the left side, a pedestrian and cycle path 3.0 m wide (clear width) with a bituminous mass should be built, separated from the carriageway by a 15 cm concrete curb and on the other side by an 8 cm concrete edge. The existing earth-surfaced road should be levelled and given a slope towards the escarpment, while the section of the carriageway made of bituminous mass should be levelled/surfaced and new layers of AC laid. The regulation and levelling of the carriageway with a width of up to 2.5 m of the earth-surfaced road should be carried out with slopes. The exit from the provincial road and the internal road from km 0+294.50 to 0+321.60 should be made of asphalt concrete. Along the road, a pedestrian and cycle path 3.0 m wide (clear width) (with a curb and edge 3.23 m) should be built, separated from the carriageway by a 15 cm concrete curb on a concrete bench with a support and on the other side by an 8 cm concrete edge on a concrete bench with a support. On the section where the pedestrian and cycle path does not directly adjoin the internal road, it should be bounded on both sides by an 8 cm concrete edge on a concrete bench with a support. The projected width of the pedestrian and cycle path allows for the free overtaking of slowly moving persons, so there is no need to design widenings or passing places. The length of the pedestrian and cycle path being built is 316.70 m. Drainage: Along the length of the planned works, the following is planned: - the extension of the existing culvert with a diameter of Ø1000 by 3 m with the replacement of the crossing part with Ø1000 pipes made of PP with concrete headwalls. A water law declaration has been made for the planned scope of work. The drainage of the road has been directed through a transverse slope towards the adjacent lower-lying terrain. The drainage of the pedestrian and cycle path has also been directed through a transverse slope towards the adjacent lower-lying terrain. - the construction of a culvert with a diameter of Ø600 and a length of 12.50 m with a PP SN-8 pipe with an inlet and outlet cut at an angle and also lined with concrete paving stones on C12/15 concrete. A water law declaration has been made for the planned scope of work. The drainage of the exits has been directed through transverse and longitudinal slopes towards the adjacent open ditch or lower-lying terrain. The design documentation is adapted to the identified needs of persons with disabilities and is in line with the concept of universal design. The Contracting Authority envisages the requirements indicated in Article 95(1) in terms of employment by the Contractor or subcontractor under an employment contract of persons performing the activities referred to in Chapter XXIV of the SWZ in the context of the implementation of the contract. The Contracting Authority does not allow the possibility of submitting partial offers - a detailed justification is contained in the SWZ. The contract execution deadline – within 4 months from the date of signing the contract. The Contractor is bound by the offer until 08.01.2027. In accordance with Article 13(1) and (2) of the European Parliament and Council Regulation (EU) 2016/679 of 27 April 2016 on the protection of individuals with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation) (OJ EU L 119 of 04.05.2016, p. 1), hereinafter referred to as the "GDPR", the Contracting Authority informs that: 1) The Mayor of Lubycza Królewska, with its registered office at ul. Kolejowa 1, 22-680 Lubycza Królewska, is the administrator of the personal data of the Contractor and the persons whose data the Contractor has provided in this procedure; 2) In matters relating to the protection of personal data, you may contact the Data Protection Inspector, at the email address: [email protected] or by post to the Administrator (further information is contained in Chapter XXVII of the SWZ). The Contracting Authority does not provide for partial payment. The Contracting Authority envisages the application of the so-called reverse procedure, referred to in Article 139(1) of the Act, i.e. the Contracting Authority first carries out an examination and evaluation of the offers, and then carries out a subjective qualification of the Contractor, the offer of which was the highest rated, in terms of the absence of grounds for exclusion and the fulfilment of the conditions for participation in the procedure. In accordance with Article 139(2) of the Act, the Contractor is not obliged to submit with the offer a declaration referred to in Article 125(1) of the Act. This declaration will be required only from the Contractor whose offer is the highest rated.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – Roboty budowlane pod nazwą: „Zrównoważona termomodernizacja i modernizacja infrastruktury Ginekologiczno-Położniczego Szpitala Klinicznego w Poznaniu na rzecz poprawy efektywności energetycznej i ochrony środowiska” Zwiększenie efektywności energetycznej budynku A. Realizacja prac w trybie zaprojektuj i wybuduj
GINEKOLOGICZNO-POŁOŻNICZY SZPITAL KLINICZNY IM. HELIODORA ŚWIĘCICKIEGO UNIWERSYTETU MEDYCZNEGO IM. KAROLA MARCINKOWSKIEGO W POZNANIUPolandConstruction workSite-development workDistrict-heating mains construction workDeadline in 5 daysPublished on Oct 22, 2026
Poland – Engineering works and construction works – Wykonanie ekranów termoizolacyjnych metodą iniekcji na hałdzie PGG S.A. Oddziału KWK ROW Ruch Rydułtowy.
Polska Grupa Górnicza S.A.PolandEngineering works and construction worksConstruction workDeadline in 9 daysPublished on Oct 22, 2026
Poland – Cycle path construction work – Budowa ścieżek rowerowych oraz miejsc obsługi dla rowerów w ramach zadania: „ROWEROWE ROZTOCZE. DROGI PIESZO-ROWEROWE W OBSZARACH WIEJSKICH”
Powiat tomaszowski reprezentowany przez Zarząd Dróg Powiatowych w Tomaszowie LubelskimPolandCycle path construction workFootpath construction workSite preparation workDeadline in 11 daysPublished on Oct 22, 2026
Poland – Overhaul and refurbishment work – Remont i termomodernizacja obejmujące projekt „Poprawa efektywności energetycznej w zabytkowym budynku Biblioteki Uniwersyteckiej UMK w Toruniu wraz z instalacją OZE” przy ul. Gagarina 13 w Toruniu.
Uniwersytet Mikołaja Kopernika w ToruniuPolandOverhaul and refurbishment workBuilding installation workElectrical installation workDeadline in 11 daysPublished on Oct 22, 2026