Skip to content
Back to search
This tender has been withdrawn.

Poland – Solar photovoltaic modules – Działania inwestycyjne w zakresie budowy infrastruktury Klastra Energii Energia Południa – instalacje fotowoltaiczne, magazyny energii oraz instalacja wodorowa

GMINA GNOJNIKPolandPublished on Sep 30, 2026
Deadline passed

Description

The subject of the contract is the implementation of an investment task within the project entitled „Investment actions in the field of building the Infrastructure of the Energy Cluster Energia Południa”. 2. The contracting authority, in accordance with Article 91(1) of the Act, allows for the submission of partial offers. The contract has been divided into 2 (two) parts, as follows: 2.1. Part 1 „Investment actions in the field of building the infrastructure of the Energy Cluster Energia Południa – photovoltaic installations, energy storage and heat pumps for CO and CWU in private buildings and public utility buildings” The contract involves the design, delivery, assembly and commissioning of: 1) for the Gmina Gnojnik: Residential buildings: a) 140 photovoltaic installations with a hybrid inverter and energy storage, b) 5 photovoltaic installations with a hybrid inverter without energy storage, c) 14 energy storage installations with a hybrid inverter, d) 57 heat pump installations for CO and CWU, Public utility buildings: a) 14 photovoltaic installations with a hybrid inverter and energy storage, b) 4 energy storage installations with a hybrid inverter, 2) for the Gmina Borzęcin: Residential buildings: a) 79 photovoltaic installations with a hybrid inverter and energy storage, b) 3 photovoltaic installations with a hybrid inverter without energy storage, c) 9 energy storage installations with a hybrid inverter, Public utility buildings: a) 12 photovoltaic installations with a hybrid inverter and energy storage, 3) for the Gmina Czchów: Residential buildings: a) 198 photovoltaic installations with a hybrid inverter and energy storage, b) 3 photovoltaic installations with a hybrid inverter without energy storage, c) 14 energy storage installations with a hybrid inverter, Public utility buildings: a) 16 photovoltaic installations with a hybrid inverter and energy storage, 4) for the Gmina Dębno: Residential buildings: a) 93 photovoltaic installations with a hybrid inverter and energy storage, b) 4 photovoltaic installations with a hybrid inverter without energy storage, c) 14 energy storage installations with a hybrid inverter, d) 66 heat pump installations for CO and CWU, Public utility buildings: a) 15 photovoltaic installations with a hybrid inverter and energy storage, 5) for the Gmina Iwkowa: Residential buildings: a) 43 heat pump installations for CO and CWU, Public utility buildings: a) 9 photovoltaic installations with a hybrid inverter and energy storage, b) 9 heat pumps/cascades of heat pumps for CO and CWU, 6) for the Gmina Szczurowa Residential buildings: a) 68 photovoltaic installations with a hybrid inverter and energy storage, b) 3 photovoltaic installations with a hybrid inverter without energy storage, c) 11 energy storage installations with a hybrid inverter, Public utility buildings: a) 14 photovoltaic installations with a hybrid inverter and energy storage, b) 4 photovoltaic installations with a hybrid inverter without energy storage, c) 2 energy storage installations with a hybrid inverter The detailed scope of the Contractor's obligations is described in the Project Technical Documentation (Subject of the Contract), which is Annex No. 1.1 to the SWZ and in the Draft Contract Terms, which are Annex No. 2.1 to the SWZ, being an integral part of the SWZ. 2.2. Part 2 – „Investment actions in the field of building the infrastructure of the Energy Cluster Energia Południa – hydrogen installation” The contract involves the design, delivery, assembly and commissioning of a hydrogen installation cooperating with the existing photovoltaic installation of the Contracting Authority – Gmina Gnojnik, located on the site of the Sewage Treatment Plant in Gnojnik. The detailed scope of the Contractor's obligations is described in the Project Technical Documentation (Subject of the Contract), which is PFU – Construction of OZE installation in the area of Gmina Gnojnik - hydrogen installation (Annex No. 1.2 to the SWZ) and in the Draft Contract Terms (Annex No. 2.2 to the SWZ), which are an integral part of the SWZ.

CPV codes

Solar photovoltaic modulesAir cylindersElectrical installation workSolar panelsLithium accumulatorsBattery packsChargersSolar installationBuilding installation workSolar panel roof-covering workElectrical fitting workEngineering design servicesWater boilersPlumbing and sanitary worksHeating, ventilation and air-conditioning installation workElectricity supply installationsLow-voltage installation workHydrogenTanksStorage tanksFuel pumpsConstruction work for gas pipelinesMechanical engineering installation works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders