Skip to content
Back to search
This tender has been withdrawn.

Poland – Solar energy – Dostawa i montaż instalacji OZE dla mieszkańców oraz Budynków Użyteczności Publicznej dla Gminy i Miasta Odolanów

Gmina i Miasto OdolanówPolandPublished on Sep 29, 2026
Deadline passed

Description

The subject of the contract is the supply and installation of Renewable Energy Sources (photovoltaic panels with energy storage) in individual households and public utility buildings in the area of the Municipality and City of Odolanów as part of the investment task entitled "Investment actions in the field of building the infrastructure of the Energy Cluster of the Municipalities of Odolanów, Przygodzice, Sulmierzyce”. The task is carried out in the "design and build" formula, on the properties of the residents of the Municipality and City of Odolanów and Public Utility Buildings, within the framework of the contract no. KPOD.03.12-IP.05-0022/24, the project entitled "Investment actions in the field of building the infrastructure of the Energy Cluster of the Municipalities of Odolanów, Przygodzice, Sulmierzyce” co-financed under the Investment B2.2.2/G1.1.2 of the National Reconstruction and Resilience Plan (KPO): RES installations carried out by energy communities, Part B: investment support for energy communities.5.1.The task has been divided into four parts.1) Part one: Supply and installation of photovoltaic panels and energy storage for DISTRICT 1 – ODOLANÓW. 2) Part two: Supply and installation of photovoltaic panels and energy storage for DISTRICT 2 – BONIKÓW, GARKI, HUTA, NADSTAWKI, RACZYCE, ŚWIECA, UCIECHÓW, 3) Part three: Supply and installation of photovoltaic panels and energy storage for DISTRICT 3 – BABY, GLIŚNICA, GORZYCE MAŁE, KUROCH, KACZORY, NABYSZYCE, TARCHAŁY MAŁE, TARCHAŁY WIELKIE, WIERZBNO. 4) Part four: Supply and installation of photovoltaic panels and energy storage for Public Utility Buildings of the Municipality and City of Odolanów. 2. Information on the power and quantity of photovoltaic installations and the capacities and quantities of energy storage in the individual parts of the contract has been indicated in Annex no. 11 to the SWZ. The information provided in this annex results from the application for co-financing and the declarations of the residents regarding their participation in the project, and may therefore change during the proceedings or the execution of the contract. The Contracting Authority reserves the right to correct changes that increase or decrease within the framework of the options. The Contracting Authority guarantees the implementation of the basic scope of the given part of the contract at a level not lower than 90% of the total power of the photovoltaic installations and 90% of the total capacity of the energy storage specified for this part of the contract in the SWZ. The Contracting Authority's use of the option right to reduce the material scope of the contract may not lead to a reduction in the total power of the photovoltaic installations or the total capacity of the energy storage intended for implementation below the above-mentioned level of 90% of the basic scope. This means that the maximum reduction in the scope of the contract within the framework of the option right may be no more than 10% of the total power of the photovoltaic installations and no more than 10% of the total capacity of the energy storage specified for the basic scope of the given part of the contract. The Contractor's remuneration in the event of a reduction in the scope of the contract will be correspondingly reduced on the basis of the unit prices indicated in the Contractor's offer. 3. Description applies to all parts: The scope of work for all parts of the contract includes the preparation of construction and execution projects (for each building object project) together with all the legal agreements, opinions, consents and decisions required, as well as the connection of micro-installations to the power grid, and on this basis the execution of all construction and installation work on the resident's property and public utility buildings, as well as the fulfillment of the remaining services specified in the PFU and the contract, including the conduct of training sessions for the users of the objects in the field of operating the installation, servicing the installation during the warranty and guarantee period. 5.2.Detailed description of the subject of the contract: - for tasks no. 1, 2, 3 was included in the Functional and User Program, prepared by PERSEM Sp. z o.o. ul. Kędzierzyńska 17A/102, 41-902 Bytom, constituting Annex no. 12 to the SWZ., -for task no. 4 was included in the Functional and User Program, prepared by PERSEM Sp. z o.o., ul. Kędzierzyńska 17A/102, 41-902 Bytom, constituting Annex no. 13 to the SWZ. The Contracting Authority has placed the SWZ and the annexes, which are its integral part, on the website of the conducted procedure. The rights and obligations of the Contractor also result from the template contract constituting an annex to the SWZ.5.3.The Contracting Authority envisages the possibility of convening a meeting of Contractors in order to explain the content of the SWZ. The date of the meeting will be given at a later date. The Contracting Authority will provide information on the date of the meeting on the website of the conducted procedure. The meeting will take place in the seat of the Municipality and City of Odolanów, room 2.1 Conference Room (address: Rynek 1, 63-430 Odolanów). The description of the subject of the contract in terms of equivalence, in terms of art. 100 para. 1 of the Pzp Act and in terms of requirements regarding the compliance of ICT solutions is contained in point 5.4 of the SWZ. The Contracting Authority, pursuant to art. 139 para. 1 of the Pzp Act, will first carry out an examination and evaluation of offers, and then qualify the Contractor, whose offer was the highest rated, in terms of the absence of grounds for exclusion and the fulfilment of the conditions for participation in the procedure. The Contracting Authority does not envisage the granting of advances on account of the performance of the contract. The Contracting Authority, pursuant to art. 455 para. 1 point 1 of the Pzp Act, envisages the possibility of making changes to the provisions of the concluded contract. The projected provisions for changing the contract in the matter of a public contract on the principles, scope and in the cases specified in the template contract, which is an integral annex to the SWZ. The Contracting Authority allows the submission of partial offers for individual parts of the contract, with the proviso that these parts may not be divided by the Contractors. Before the commencement of the

CPV codes

Solar energyBuilding installation workSolar photovoltaic modulesSolar installationSolar panel roof-covering workInvertersElectric accumulatorsBattery packsInstallation services of electricity control equipmentElectrical installation workProject and design preparation, estimation of costsConstruction workSite preparation workBuilding completion workArchitectural and related servicesEngineering servicesElectrical servicesEngineering design servicesEngineering design services for mechanical and electrical installations for buildingsAncillary building servicesElectrical equipment and apparatusElectrical wiring and fitting work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders