Bulgaria – Architectural services for buildings – ИЗГОТВЯНЕ НА РАБОТНИ ИНВЕСТИЦИОННИ ПРОЕКТИ ЗА ИЗПЪЛНЕНИЕ НА МЕРКИТЕ ПО ТЕХНИЧЕСКИ И ЕНЕРГИЕН ПАСПОРТ С ЦЕЛ ФУНКЦИОНАЛНО ОБНОВЯВАНЕ, РЕМОНТ И ИЗПЪЛНЕНИЕ НА МЕРКИ ЗА ЕНЕРГИЙНА ЕФЕКТИВНОСТ В 21 СУ ХР БОТЕВ КАКТО И ЦЯЛОСТЕН РЕМОНТ НА ДВОРНО ПРОСТРАНСТВО И ИЗГРАЖДАНЕ НА НОВ ФИЗКУЛТУРЕН САЛОН С ТОПЛА ВРЪЗКА, ИЗМЕСТВАНЕ НА СЪЩЕСТВУВАЩ ТРАФОПОСТ И КАБЕЛИ ЗА НОВ, И ОСЪЩЕСТВЯВАНЕ НА АВТОРСКИ НАДЗОР
Description
The contract aims to prepare working investment projects for functional renovation, repair, and implementation of energy efficiency and accessibility measures in 21 SU Hr. Botev, construction of a new gym, relocation of a transformer substation, and renovation of the courtyard area. The project solutions should cover the full scope of activities described in the Technical Specification, Appendix No. 1, the technical passport, the Report from the technical survey, and the energy-saving measures described in the Energy Efficiency Survey Report. The activities are divided into the following main groups: Group 1 – Energy efficiency, functional renovation and accessible environment in the main school building: thermal insulation of external walls, roof and floors (while preserving the unified architectural appearance and treatment of concrete elements on the facades); roof repair and hydro insulation; measures for the heating installation; high-temperature heat pump type "air-water" with a COP of not less than 350% and joint (bivalent) operation with the subscriber station; system for automatic control and management of heat supply; replacement of lighting with LED luminaires; replacement of electrical panels and installations; lightning protection; photovoltaic plant for own consumption with inverter and battery block; additional photovoltaic plant for powering the heat pump; ensuring an accessible environment in accordance with Ordinance No. RD-02-20-2/26.01.2021; Group 2 – Demolition of the existing gym and construction of a new gym with a warm connection to the main building (two-storey – with a basketball and volleyball court and a tribune zone at parterre level, supplementing the sports zone with an athletics track on the second level, fitness, table tennis, teacher's office, storage and sanitary facilities), including VRF installation and ventilation, HVAC and electrical installations of the new hall, and a facility for direct access for people with disabilities; Group 3 – Relocation of the existing transformer substation, located in the building of the old gym, and cables for the new TPP, in accordance with the instructions from the operating company; Group 4 – Comprehensive repair and renovation of the courtyard area: sports facilities with modern sports surfaces and leveling of the slope of the playgrounds; outdoor fitness; rest areas; play area in accordance with Ordinance No. 1/2009; drinking water corner; park furniture; landscaping and sanitary expertise of the vegetation; reconstruction of the fence; lighting and video surveillance in the yard; drainage of surface waters. The above groups of activities do not represent separate sub-objects. For the purposes of design, permitting, and execution of the construction, the activities are divided into three sub-objects: Sub-object 1 – Energy efficiency, functional renovation and accessible environment in the main school building; Sub-object 2 – Demolition of the existing gym and construction of a new gym with a warm connection to the main building, including relocation of the existing transformer substation and cables for the new TPP; Sub-object 3 – Comprehensive repair and renovation of the courtyard area. The investment projects should be developed in the working phase and include the following parts, according to the Technical Specification: "Architectural" part, including the color scheme of the facades, accessibility plan and navigation system (incl. "Interior" part for the sub-object "Construction of a new gym with a warm connection"); "Structural" part, incl. for new constructions, for demolition activities, for sports facilities and if necessary ramps, elevator, retaining walls; "Safety and Health Plan", including demolition works and "Temporary Traffic Organization", if a special regime is required during execution; "Water supply and sewerage" part, incl. internal and courtyard; "Electrical" part, incl. high voltage, low voltage, lightning protection, photovoltaics; "HVAC" (heating, ventilation and air conditioning); "Fire Safety"; "Landscaping and improvement"; "Geodesy" (geodetic survey, vertical planning, tracing plan); "Waste Management Plan" (WMP); "Cost Estimate Documentation"; "Project for relocation of transformer substation", currently located in the existing building of the gym; "CIS" (Construction Organization and Execution Plan); "Energy Efficiency"; "Technological" part; Engineering-geological report; Detailed quantity survey for all parts, with strict adherence to the approved Technical Specification. The part of the investment project relating to the energy-saving measures in the main school building is intended for the implementation of a project applying for grant funding for construction and installation works under Sub-programme EEOUDG of NDEF. The remaining activities within the scope of the order (new gym, relocation of transformer substation, renovation of the courtyard area and others), which are outside the scope of the grant funding from NDEF, are financed from the budget of the Municipal of Sofia and/or from another source. When preparing the project, the Contractor must ensure that the project solutions for the energy-saving measures comply with the requirements in the Energy Efficiency Survey Report package of measures; compliance of this part of the investment project with the applicable requirements of NDEF to investment projects, presented for preliminary control (in accordance with the Rules for financing under Sub-programme EEOUDG and the annexes thereto); preparation of the quantity-cost estimates in a manner that allows clear differentiation of the costs eligible for grant funding from NDEF (SMR and delivery of equipment for energy-saving measures) from the remaining costs of the project; provision of the necessary assistance to the Beneficiary in the preliminary control of the investment project by NDEF and in the elimination of any inaccuracies or non-compliances in the data identified by NDEF.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Bulgaria – Construction supervision services – Консултантска услуга по чл. 166 от Закона за устройство на територията /ЗУТ/ и свързаните с него подзаконови нормативни актове, изпълнение на задълженията на координатор по безопасност и здраве, съгласно Наредба № 2 от 22 март 2004 г. за минималните изисквания за здравословни и безопасни условия на труд по обособени позиции
СТОЛИЧНА ОБЩИНАBulgariaConstruction supervision servicesDeadline in 29 daysPublished on Aug 03, 2026
Bulgaria – Engineering design services – Изработване на проект за изменение на ПУП-ПРЗ и на технически инвестиционен проект за обект „Детско заведение и физкултурен салон – етапно строителство“, ул. „Даме Груев“ № 1, гр. Пловдив, район „Южен“,
ОБЩИНА ПЛОВДИВ - РАЙОН "ЮЖЕН"BulgariaEngineering design servicesArchitectural design servicesSupervision of project and documentationDeadline in 23 daysPublished on Aug 03, 2026
Bulgaria – Architectural design services – Проектиране и осъществяване на авторски надзор на следния обект: Обект: «Северен обходен път на гр. Горна Оряховица» / 9,3 km.
ОБЩИНА ГОРНА ОРЯХОВИЦАBulgariaArchitectural design servicesDeadline in 27 daysPublished on Aug 02, 2026
Bulgaria – Construction-site supervision services – Предоставяне на консултантски услуги – изготвяне на доклад за оценка на съответствието и упражняване на строителен надзор на обект: Инженеринг - проектиране, изпълнение на СМР и авторски надзор на обект: Основен ремонт на МБАЛ „Света Екатерина“, гр. Димитровград.
ОБЩИНА ДИМИТРОВГРАДBulgariaConstruction-site supervision servicesDeadline in 28 daysPublished on Aug 02, 2026