France – Siteworks – Tramway T7 Marché de Travaux d'accompagnement
Description
The contract includes the following works and associated services: - Execution studies with delivery of DOE at the end of the contract; - Various clearance works, tree felling, various demolitions, removal of abandoned networks, removal of asbestos pipes, road milling; - Marking, horizontal and vertical signage, pedestrian pathways, for the T7 accompanying works; - Coordination with the contract holder in charge of the temporary SLT and temporary lighting and the movement of temporary elements along the site; - General demolitions and earthworks: - Dry networks (including ducts, protective concrete, various chambers, setting of plugs to the level); - Edgings and various islands; - Road, pavement, and parking structures; - Road, pavement, island, parking and various area coverings; - Road drainage; - Supply and installation of standard urban furniture; - Police signage (horizontal and vertical), site or non-site; - Masonry and miscellaneous minor civil engineering works, treatments on parcel edges (fences, gates, walls); - The opening of tree pits. This list is not exhaustive and is supplemented by all the elements contained in the various documents comprising the contract.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Lift and escalator installation work – Maintenance et Travaux de modernisation et remplacement sur le parc d’ascenseurs, élévateurs pour personnes à mobilité réduite et monte-charges de l’Université de Lille.
Université de LilleFranceLift and escalator installation workDeadline in 24 daysPublished on Oct 15, 2026
France – Earthmoving work – CRÉATION D’UN ESPACE SPORT AND WELLNESS PARK SUR LE SITE D’ENTIORE
Toulouse Business SchoolFranceEarthmoving workConstruction work in connection with structures for sports groundDeadline in 31 daysPublished on Oct 15, 2026
France – Construction work – Marchés de travaux de second œuvre
FRANCE TRAVAIL - CVLFranceConstruction workInstallation of partitioningElectrical installation workDeadline in 31 daysPublished on Oct 15, 2026
France – Engineering works and construction works – RD900 RD914 Requalification entre le giratoire de Mailloles et le giratoire du Mas Rouma - Ouvrage SNCF OA5
CONSEIL DEPARTEMENTAL DES PYRENEES-ORIENTALESFranceEngineering works and construction worksDeadline in 33 daysPublished on Oct 15, 2026