Poland – Construction work – Rozbudowa stacji 220/110 kV Recław dla przyłączenia nowych obiektów do KSE

Polskie Sieci Elektroenergetyczne Spółka AkcyjnaPolandPublished on Nov 18, 2026
5 days left

Description

The subject of the Contract is the expansion of the 220/110 kV Recław station for connecting new facilities to the KSE, i.e. carrying out all activities, including design work, legal formalities and construction work (including the purchase and supply of Equipment and Materials), necessary for the construction of the field in SE REC and the construction of the Railway Bridge along with the dedicated security building and an element not directly related to the construction of the bridge, which is the direct access to the station site. The construction of the Railway Bridge shall be carried out in accordance with the guidelines for Railway Bridges (Annex No. 3 to Part II SWZ - Functional-User Programme (hereinafter PFU). The Contractor will be responsible for preparing the complete construction documentation, execution documentation and obtaining the Building Permit, the Permit for Use, the execution of the Works, bringing them to a defect-free acceptance and preparing the post-construction documentation. 2. A detailed description of the subject of the contract is given in Part II SWZ Functional-User Programme. 3. Within the Contract, the Contracting Authority envisages the possibility of exercising the right of option. 4. Names and codes of the Common Procurement Vocabulary: 45100000-8, 45200000-9, 45300000-0, 45400000-1, 45500000-2, 71200000-0, 71300000-1, 71400000-2, 71500000-3 5. In each and every case where the Contracting Authority, by referring to standards, technical assessments, technical specifications and technical reference systems, as mentioned in Article 101(1)(2) and (3) of the Act, describes the subject of the Contract, the Contracting Authority allows equivalent solutions described, if they allow to obtain features or parameters not worse than those referred to. The above means that the Contractor may apply solutions described by the Contracting Authority "or equivalent". 6. The Contractor who refers to solutions equivalent to those described by the Contracting Authority is obliged to prove that the supplies, services or construction works offered by him meet the requirements specified by the Contracting Authority. The condition for applying equivalent solutions is the written approval by the Contracting Authority. Differences between the referred standards and their equivalents must be precisely described by the Contractor and submitted to the Contracting Authority during the execution of the Contract - for approval. 7. The Contracting Authority informs that the local inspection is mandatory for Contractors. Before submitting an offer, the Contractor must inspect the site where the works constituting the subject of the submitted offer will be carried out and familiarise themselves with the conditions for the implementation of the contract and the difficulties encountered. Proposals for the date of the site inspection should be sent to the e-mail address: [email protected]. Date of the inspection: first date by 27.08.2026; second date by 21.09.2026. Access to the site for the purpose of carrying out the local inspection requires the registration of the inspection participants by completing the relevant Annexes No. 1, 2, 3 to the Instruction for granting and supervising permits for access and controlling the movement of materials and vehicles on the premises of the power stations of PSE S.A. and submitting them via the Procurement Platform (tab "questions/information"), no later than 5 working days before the agreed date of the inspection. Place of the local inspection: SE RECŁAW is located in the town of RECŁAW. In the case of Contractors jointly applying for the subject matter of the contract, the presence of one of them is sufficient. In accordance with Article 226(1)(18) of the Act, the Contracting Authority will reject an offer which was submitted without carrying out a local inspection or without verifying the documents necessary for the implementation of the contract available on site with the Contracting Authority, in cases where the Contracting Authority required this in the contract documents.

CPV codes

Construction workSite preparation workWorks for complete or part construction and civil engineering workBuilding installation workBuilding completion workHire of construction and civil engineering machinery and equipment with operatorArchitectural and related servicesEngineering servicesUrban planning and landscape architectural servicesConstruction-related services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.