Skip to content
Back to search

Germany – Architectural, engineering and planning services – Generalplanungsleistungen für die denkmalgerechte Teilsanierung des GAT-Bereichs im ehemaligen Flughafen Tempelhof

Land Berlin vertreten durch die Tempelhof Projekt GmbHGermanyPublished on Oct 04, 2026
No deadline given

Description

The single-storey GAT building, an extension of Tempelhof Airport constructed between 1951 and 1953 as a check-in building for civil aviation, is located in the western wing of the airport between stair towers 5 and 6. It is situated between the land side of the airport and the boarding gates on the covered apron, known as the Transit-Gang in building section A1. The planning area (GFA: 959 sqm) includes the building volume of the single-storey GAT extension between stair towers 5 and 6, as well as between the external spaces in front of the entrance and the partition wall to the Transit-Gang in building A1. The planning contract is awarded in stages and includes phases 1 to 8 for the basic services of all relevant planning of the described services according to HOAI at 100%. The following applies: - Performance level 1: LP 1-2 - Performance level 2: LP 3-4 - Performance level 3: LP 5-7 - Performance level 4: LP 8 There is no entitlement for the contractor to call up performance levels 2-4.

CPV codes

Architectural, engineering and planning servicesArchitectural design servicesArchitectural and related services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders