Switzerland – HVAC packages – ETH Zürich, CAB/CNB Ersatz Gebäudeautomation, BKP 243/244, Wärmeverteilung/Lüftungsanlagen
Description
To achieve a uniform execution at the automation level, outdated motors are replaced and protection-based star-delta and step switching are eliminated. In many cases, the motors and/or fans as well as pumps are also replaced. For all non-critical systems, pumps and fans are equipped with EC motors (with integrated commutation unit). For critical systems, asynchronous motors with external frequency converters are used. For HVAC systems, the LE-, LK- and group fan drives are fundamentally replaced, volume flow and pressure measurements are replaced and supplemented (in particular 4-20mA sensors). On behalf of the ERR, the chilled ceiling fan drives and room controls/sensors are replaced with Modbus-capable field devices. The connection of the radiator valves and dew point monitors is made conventionally by means of I/O.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Industrial machinery – LOS 1 Hydraulische Steuerung und Verteilleitung Hilfssysteme Kraftwerk Pradella
Engadiner Kraftwerke AGSwitzerlandIndustrial machineryDeadline in 17 daysPublished on Nov 08, 2026
Switzerland – Parts of hydraulic turbines – Replacement of the Cylindrical Valves of Units 1, 2 and 3
Groupe E SA - Service Achat pour les Marchés publicsSwitzerlandParts of hydraulic turbinesDeadline in 1 dayPublished on Oct 28, 2026
Switzerland – Industrial machinery – MP 2026.08.865 – Renouvellement des installations de lavage de Perrelet et de la Borde
Transports publics de la région lausannoise saSwitzerlandIndustrial machineryMiscellaneous cleaning machinesDeadline in 26 daysPublished on Oct 25, 2026
Switzerland – Vehicle location system – MP 2026.03.839 - Acquisition d'une solution de géolocalisation indoor/outdoor
Transports publics de la région lausannoise saSwitzerlandVehicle location systemCommand and control system, printing, graphics, office automation and information-processing equipmentDeadline in 15 daysPublished on Oct 08, 2026