Germany – Architectural, construction, engineering and inspection services – Neubau Faulungsanlage KA Müllekoven - Los 03 Tragwerksplanung
Description
Construction of a digestion plant at the Troisdorf-Müllekoven sewage treatment plant: The Troisdorf-Müllekoven sewage treatment plant is currently designed for an expansion size of 84,000 PE. The districts of Troisdorf, Troisdorf West, Friedrich-Wilhelms-Hütte, Oberlar, Sieglar, Eschmar, Rotter See, Kriegsdorf, Müllekoven and Bergheim form the catchment area of the sewage treatment plant. The predominantly municipal wastewater flows to the sewage treatment plant via a combined sewer DN 1200. One of the two digesters has exceeded its technical service life of 50 years according to DIN 1995, and the second digester has almost reached its maximum technical service life. Both tanks are asbestos-contaminated. The agitators are outdated. The project includes the construction of digesters (the current demand planning provides for two digesters), the renewal of the heating system (plus building), the installation of new or existing combined heat and power plants (CHP), the increase in gas storage volume, and the expansion of power feed-in (emergency power feed-in, in the future additional feed-in through AGRI-PV system). The new construction must be carried out while maintaining the existing operation of the sewage treatment plant. The multifunctional heating system for digester and building heating (burns digester gas or oil) is approximately 30 years old and must be technically replaced urgently. It also serves as an emergency system in the event of CHP failure. No spare parts are available. The existing CHPs are over 10 years old and will soon be replaced by new CHPs. In addition, the gas purification plant (Siloxa) is outdated. The feed-in capacity is reached. In addition to the existing gas storage, a new gas tank is to be installed to increase the total storage volume. Only then will it be possible in the future to use AGRI-PV power intelligently, as the gas-to-power conversion via CHPs will then take place in the evening and night hours. In addition, the "flaring" of excess digester gas will be reduced. According to the EU Urban Wastewater Directive, the energy demand of the sewage treatment plant is to be gradually converted (2030: 50%; 2035: 75% and 2040: 100%) to its own renewable energy generation. This implementation includes the renewal and expansion of digester gas production and gas storage. It is planned that the dismantling of the old digesters will be dealt with during the planning process. However, according to the current state of knowledge, the dismantling work is to be carried out at a much later date outside this project.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Engineering services – Umn. d. ehem. Hallenbades in Haidmühle in ein Bürgerzentrum m. Veranstaltungshalle, Tragwerksplanung
Gemeinde HaidmühleGermanyEngineering servicesNo deadline givenPublished on Nov 05, 2026
Germany – Architectural, engineering and planning services – 221 MWG Neubau Turnhalle Abzw. Maria-Wächtler-Gymnasium: Generalplanerleistungen
GVE Grundstücksverwaltung Stadt Essen GmbHGermanyArchitectural, engineering and planning servicesArchitectural, construction, engineering and inspection servicesArchitectural and related servicesNo deadline givenPublished on Nov 05, 2026
Germany – Expert witness services – Schachtanlage Asse II: Sachverständiger der atomrechtlichen Aufsicht nach § 20 AtG: Begutachtung von Fragestellungen in Bezug auf die Strahlenschutzinstrumentierung
Bundesamt für die Sicherheit der nuklearen EntsorgungGermanyExpert witness servicesDeadline in 33 daysPublished on Nov 05, 2026
Germany – Construction-related services – Baustellenlogistik - VE 3915
Stadt FürthGermanyConstruction-related servicesDeadline in 32 daysPublished on Nov 05, 2026