Poland – Construction work – Rozbudowa i przebudowa budynku i jego adaptacja na cele kulturalne kinoteatr Włókniarz - Rewitalizacja terenów miasta.
Description
1. Contract Title: Expansion, renovation, and adaptation of the building and its surroundings for cultural purposes of the Włókniarz cinema - Revitalization of the city's areas. 2. The subject of the contract is: renovation, expansion, extension, and adaptation of the former cinema "Włókniarz" together with its surroundings for cultural purposes. 3. Basic scope of work: - demolition and dismantling works, - execution of connections, - roof renovation, - facade construction - facade renovation using a conservation method, - renovation of door joinery, - replacement of window joinery, - construction of a staircase with a window lift, - renovation and expansion of the cloakroom complex, - expansion of the backstage and multifunctional hall, - renovation of the concert hall, - expansion and renovation of the basement, - execution of hydrant, c.o., water, sewage, electrical, low-voltage, fire alarm, and accessible installations, - execution of mechanical ventilation and air conditioning installations, - execution of photovoltaic installations, - finishing and assembly works, - supply and assembly of cinema, stage, and sound equipment, - tree cutting, compensatory planting, landscaping, - land development: construction of parking lots, maneuvering roads and fire roads, installation of small architecture and area lighting. 4. Brief description of the object. The object is located at ul. Pr. I. Mościckiego 6 in Tomaszów Mazowiecki. On the land registry plots 271/1, 271/3, 272, there is the subject building of the former cinema "Włókniarz", objects designated for demolition, and a multi-family residential building. The investment area is under conservation protection. According to the order no. 368/2019 of the President of the City of Tomaszów Mazowiecki, the object has been included in the Municipal Register of Monuments of Tomaszów Mazowiecki, as well as the multi-family residential building at ul. Pr. I. Mościckiego 8. Furthermore, land registry plots 271/1 and 272 have been included in the conservation protection zone of the historical spatial layout - the central zone. The area is wooded and overgrown, partially built-up. In order to implement the investment assumptions, a thorough change in the development of the land for all plots covered by the project is planned. The renovation, including the extension in the shading part, adaptation, and expansion of the existing cinema building has been designed. The multi-family residential building located on plot 272 – NO CHANGES. The implementation of internal roads, including the internal fire road, connected with the existing exits from ul. T. Kawki and communication routes for users of the object, has been designed. On the subject plots, 60 parking spaces, including two for disabled persons, biologically active areas in the form of greenery and lawns, have been located. As part of the tree cutting, which is in conflict with the planned development, the cutting of selected trees and compensatory planting have been designed. A fenced area for the collection of solid waste has been designated. The implementation of land reinforcement with adaptation to the designed expansion and renovation has been designed. Power supply from a new connection on the conditions of the network manager. Water supply on the conditions of the network manager from the existing municipal water supply network in ul. Pr. I. Mościckiego through the renovation in the trace of the existing connection. Discharge of sanitary sewage to the municipal sanitary sewer network on the conditions of the network manager, to the existing canal in ul. Pr. I. Mościckiego through the existing connection. Discharge of rainwater and meltwater to the municipal storm sewer network on the conditions of the network manager, to the existing stormwater canal in ul. Pr. I. Mościckiego through the existing connection. For the needs of discharging rainwater and meltwater from internal roads and parking spaces, the implementation of a system of sewer manholes with a settler and a separator of petroleum substances has been designed. 5. A detailed description of the subject of the contract is specified in SECTION IV SWZ – OPZ and SECTION III SWZ - contract template.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – Roboty budowlane pod nazwą: „Zrównoważona termomodernizacja i modernizacja infrastruktury Ginekologiczno-Położniczego Szpitala Klinicznego w Poznaniu na rzecz poprawy efektywności energetycznej i ochrony środowiska” Zwiększenie efektywności energetycznej budynku A. Realizacja prac w trybie zaprojektuj i wybuduj
GINEKOLOGICZNO-POŁOŻNICZY SZPITAL KLINICZNY IM. HELIODORA ŚWIĘCICKIEGO UNIWERSYTETU MEDYCZNEGO IM. KAROLA MARCINKOWSKIEGO W POZNANIUPolandConstruction workSite-development workDistrict-heating mains construction workDeadline in 5 daysPublished on Oct 22, 2026
Poland – Engineering works and construction works – Wykonanie ekranów termoizolacyjnych metodą iniekcji na hałdzie PGG S.A. Oddziału KWK ROW Ruch Rydułtowy.
Polska Grupa Górnicza S.A.PolandEngineering works and construction worksConstruction workDeadline in 9 daysPublished on Oct 22, 2026
Poland – Cycle path construction work – Budowa ścieżek rowerowych oraz miejsc obsługi dla rowerów w ramach zadania: „ROWEROWE ROZTOCZE. DROGI PIESZO-ROWEROWE W OBSZARACH WIEJSKICH”
Powiat tomaszowski reprezentowany przez Zarząd Dróg Powiatowych w Tomaszowie LubelskimPolandCycle path construction workFootpath construction workSite preparation workDeadline in 11 daysPublished on Oct 22, 2026
Poland – Overhaul and refurbishment work – Remont i termomodernizacja obejmujące projekt „Poprawa efektywności energetycznej w zabytkowym budynku Biblioteki Uniwersyteckiej UMK w Toruniu wraz z instalacją OZE” przy ul. Gagarina 13 w Toruniu.
Uniwersytet Mikołaja Kopernika w ToruniuPolandOverhaul and refurbishment workBuilding installation workElectrical installation workDeadline in 11 daysPublished on Oct 22, 2026